My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:55:29 PM
Creation date
2/5/2019 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EUV-BB are presented to workers. <br /> (Gontinucd) Business convenience, The fire captain interviewed by the EHD <br /> stated that the crew could stage their <br /> equipment outside the station building <br /> and respond to emergency calls with little <br /> inconvenience, and they didn't mind <br /> doing so. <br /> Trend analysis shows MTBE will not be The trend analysis is based on data <br /> detected in MW-8B water samples by collected during GWE, and may not be <br /> September2011. applicable to natural conditions without <br /> GWE. <br /> Consultant indicated that the EHD decision <br /> on the destruction method for this well was <br /> not being contested. <br /> EW-98 Last monitoring event of the well found <br /> MTBE contaminants in the groundwater. <br /> Variance requested to be allowed to destroy The well is located on Star Street in the <br /> well by pressure grouting due to: parking lane, out of the main traffic lane. <br /> Traffic safety, The well is on a curve; but little impedes <br /> visibility along the street except for the <br /> curve itself, so proper lane and traffic <br /> control protocols should be implemented <br /> to provide personnel safety; no unusually <br /> hazardous traffic conditions were noted. <br /> Business convenience, The work required for proper destruction <br /> of this well should not directly impact the <br /> convenience of local businesses. <br /> Trend analysis shows MTBE will not be Trend analysis is based on data collected <br /> detected in EW-9B water samples by during active GWE, and may not be <br /> November2011. applicable to natural conditions without <br /> GWE. <br /> Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.