Laserfiche WebLink
Wwapnn roe Nuau 17 wxl F mll.eba.y i MrImR o.ro.l Aeb <br /> Flap Gh We.Wax rlm)he3]Wur a.r.errahce l,od LSl Joiner <br /> Pay� <br /> A 4 1 composite sal stockpile sample roll also be collected and analyzed fm the above <br /> constituents and total lead by EPA Method 601.0 The composite sample Is collected fot disposal <br /> Pluposes <br /> PRODUCTION WELL SAMPLING <br /> In response to the SICHH letter dated September 16 2005(Appendix A)Apex proposes to <br /> sample the two municipal drinking water wells located along Dc Bioggr Road on a monthly basis <br /> starting October 2005 Apex will contact the Sen Joaquin(ounty Public Wolks for access <br /> Analysis wrlI include constituents from the list above <br /> INTERIM GROUNDWATER REMEDIATION SYSTEM <br /> In response to the SICEH letter dated September 16 2005 requiring an interim imadiaunn <br /> system at the ante to halt the off site milp aurin of MTBE(Appendix A)Apex proposes to utilize <br /> groundwater pumping and ticatmmt of the)irsr ward zone Apes conducted a 51e review of the <br /> Flag City Chevron(FCC)site where a groundwatcl cxitaction system was opetaironal for <br /> approximately fact years These groundwater extraction data will he used to design and install a <br /> system at the site without the nceusity of conducting pilot testing The FCC site wells yielded a <br /> �Pumpmg rate of 4 gallons per Irunate(gpm)with an appioxunate tadius of Influence of 25 feet <br /> APLx proposes to Install five six inch diameter extiution wells(EW 1 through EW 5)along the <br /> souihein horded a1 the aIle as shown on Figinc 2 The wells will be drilled using a hollow steer <br /> auger dell rig All wells will be constructed using Schedule 80 PVC and 0 020 slotted schedule <br /> 80 PVC screen The extraction wells will bL Installed to a total depth of 25 feet lits and scieened <br /> from 5 to 25 feet bgs One inch diameter schedule.80 PVC piping will be Installed in trenches <br /> aPProximately 1 5 feet bgs from each gmundwatei extraction well to the proposed i mediation <br /> compound totaled on the west side of the mte Electrical conduits will be touted In the same <br /> trench from each well head vault box to an electitcal control panel located in the remediat=ea <br /> compound) Individual sample ports with anti backflow check valves will be installed on a <br /> Piping and valve manifold inside the remedlatron compound to accommodate individual well <br /> flow rates and samphn6 capabihi:cs fbe proposed layout of the rrniedlalion system Is shown on <br /> Figure 3 <br /> Elccttic submersible pumps capable of lifting water 40 feet at a rate of 5 gpm will be installed in <br /> all five extraction wells The extraction well pumps will have automatic controls lot Ptevenuon <br /> of dryrun operation The total flow tate for the five wells is expected not to exceed 25 gallons <br /> per minute <br /> GROUNDWATER TREATMENT USING A BIOREACTOR <br /> The aboveground treatment system proposed for this site is an Envuonrnental Resolutmns Inc <br /> (ERI)ER1 4000 fluidized bed bioteactor The biaresctoi conssis of a biomass supported oa fine <br /> sand The biomass adheres to the sand w lule consuming M7 BF and other gasoline constituents <br />