My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000277
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
ARCHIVED REPORTS XR0000277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 4:09:21 PM
Creation date
2/5/2019 3:59:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000277
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wwapnn roe Nuau 17 wxl F mll.eba.y i MrImR o.ro.l Aeb <br /> Flap Gh We.Wax rlm)he3]Wur a.r.errahce l,od LSl Joiner <br /> Pay� <br /> A 4 1 composite sal stockpile sample roll also be collected and analyzed fm the above <br /> constituents and total lead by EPA Method 601.0 The composite sample Is collected fot disposal <br /> Pluposes <br /> PRODUCTION WELL SAMPLING <br /> In response to the SICHH letter dated September 16 2005(Appendix A)Apex proposes to <br /> sample the two municipal drinking water wells located along Dc Bioggr Road on a monthly basis <br /> starting October 2005 Apex will contact the Sen Joaquin(ounty Public Wolks for access <br /> Analysis wrlI include constituents from the list above <br /> INTERIM GROUNDWATER REMEDIATION SYSTEM <br /> In response to the SICEH letter dated September 16 2005 requiring an interim imadiaunn <br /> system at the ante to halt the off site milp aurin of MTBE(Appendix A)Apex proposes to utilize <br /> groundwater pumping and ticatmmt of the)irsr ward zone Apes conducted a 51e review of the <br /> Flag City Chevron(FCC)site where a groundwatcl cxitaction system was opetaironal for <br /> approximately fact years These groundwater extraction data will he used to design and install a <br /> system at the site without the nceusity of conducting pilot testing The FCC site wells yielded a <br /> �Pumpmg rate of 4 gallons per Irunate(gpm)with an appioxunate tadius of Influence of 25 feet <br /> APLx proposes to Install five six inch diameter extiution wells(EW 1 through EW 5)along the <br /> souihein horded a1 the aIle as shown on Figinc 2 The wells will be drilled using a hollow steer <br /> auger dell rig All wells will be constructed using Schedule 80 PVC and 0 020 slotted schedule <br /> 80 PVC screen The extraction wells will bL Installed to a total depth of 25 feet lits and scieened <br /> from 5 to 25 feet bgs One inch diameter schedule.80 PVC piping will be Installed in trenches <br /> aPProximately 1 5 feet bgs from each gmundwatei extraction well to the proposed i mediation <br /> compound totaled on the west side of the mte Electrical conduits will be touted In the same <br /> trench from each well head vault box to an electitcal control panel located in the remediat=ea <br /> compound) Individual sample ports with anti backflow check valves will be installed on a <br /> Piping and valve manifold inside the remedlatron compound to accommodate individual well <br /> flow rates and samphn6 capabihi:cs fbe proposed layout of the rrniedlalion system Is shown on <br /> Figure 3 <br /> Elccttic submersible pumps capable of lifting water 40 feet at a rate of 5 gpm will be installed in <br /> all five extraction wells The extraction well pumps will have automatic controls lot Ptevenuon <br /> of dryrun operation The total flow tate for the five wells is expected not to exceed 25 gallons <br /> per minute <br /> GROUNDWATER TREATMENT USING A BIOREACTOR <br /> The aboveground treatment system proposed for this site is an Envuonrnental Resolutmns Inc <br /> (ERI)ER1 4000 fluidized bed bioteactor The biaresctoi conssis of a biomass supported oa fine <br /> sand The biomass adheres to the sand w lule consuming M7 BF and other gasoline constituents <br />
The URL can be used to link to this page
Your browser does not support the video tag.