Laserfiche WebLink
HAUL bJ <br /> • Shell Branded/New West #1003 page 2 <br /> 6437 W Banner Ave, Lodi <br /> Once the work plan is approved, the well installations must be completed within <br /> four (4) weeks and a report of the work submitted to EHD and the CVRWQCB <br /> within six (6) weeks of the work completion <br /> If any of these compliance dates are not met, the CVRWQCB may become the <br /> lead agency and formal enforcement actions may be taken <br /> Due to area specific water quality issues in this area, the two CSA wells that <br /> currently provide potable water for all the businesses here are limned to only a <br /> small zone for potable water use Any petroleum impact to either of the CSA <br /> wells will require either wellhead treatment or bottled water replacement for all of <br /> the water needs in this area It should be of utmost importance that you evaluate <br /> the extent of your plume quickly and determine if immediate remedial actions are <br /> required <br /> Please direct your submittals to Michael Infurna at the address noted on this <br /> correspondence or you may contact me at (209) 468-3454 d you should have <br /> any questions Mr Infurna can be reached by email at minfurnaesicehd com <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> i <br /> Michael J Infurna Jr , Senior REHS Margare Lagono, REHS <br /> LOP I Site Mitigation Unit IV Supervisor <br /> MI! <br /> c CVRWQCB — James Barton, Sacramento <br /> c SWRCB-CUF -- Mark Owens, Sacramento <br /> c San Joaquin County UMD — Steve Winkler <br />