My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26342
>
2900 - Site Mitigation Program
>
PR0526273
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 4:40:50 PM
Creation date
2/5/2019 4:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526273
PE
2950
FACILITY_ID
FA0017787
FACILITY_NAME
MEDINA WOOD PRODUCTS
STREET_NUMBER
26342
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25215006
CURRENT_STATUS
01
SITE_LOCATION
26342 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Tecltatcs lac. Page 2 <br /> Medina Wood Products <br /> Soil Work Plan <br /> May 26,2006 <br /> 1.2 Laboratory Analyses <br /> The soil samples will be submitted to Excelchem of Roseville (State Certified Laboratory <br /> #2119) and analyzed for: <br /> ❑ Volatile Organic Compound (VOCs)by EPA method 8260A <br /> ❑ Organochlorine Pesticides (OCPs) by EPA Method 8081A <br /> The detection limits for these compounds are listed below. A Chain of Custody will be <br /> completed for all samples collected and tracked to ensure sample integrity. <br /> Detection Limits: OCPs VOCs <br /> Method 8081A Method 8260A <br /> (mg/Kg) (mg/Kg) <br /> Soil 0.005 ppm 0.005 <br /> 2.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork within a few days of work plan <br /> approval from San Joaquin County. Enclosed with the work plan is the drilling permit and <br /> Master File Record Information Form. The information gathered during this phase of work <br /> will be presented in a report, which will include a summary of the geology as well as the <br /> results of sample analyses. Ray Kablanow, Professional Geologist and Certified <br /> Hydrogeologist will supervise the project. Copies of the report will be forwarded to the <br /> County. <br /> 3.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> E551p�y., cct` <br /> y R.l.!(ABl"W it <br /> r1A. KI NO.6234 <br /> Raynold I. Kablanow II, Ph.D. <br /> California Professional Geologist#5234 <br /> Certified Hydrogeologist#442 ����`Ctit.+<"� <br /> Registered Environmental Assessor II#20089 <br />
The URL can be used to link to this page
Your browser does not support the video tag.