My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26501
>
2900 - Site Mitigation Program
>
PR0505092
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 4:57:53 PM
Creation date
2/5/2019 4:48:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505092
PE
2960
FACILITY_ID
FA0006532
FACILITY_NAME
LYOTH LOADING STATION/CHEVRON
STREET_NUMBER
26501
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
26501 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S=AF nP f`AI IFr1R IO F man v -� <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road,Suite A <br /> Sacramento, CA 95827-3098 yr° rfJtl? 3Q P�1 2� •1C <br /> PHONE: (916) 255-3000 <br /> FAX: (916) 255-3015 C O <br /> 28 March 1994 <br /> Mr. Don O. Cubertson <br /> Chevron Pipe Line Company <br /> 5080 California Ave., Suite 400 <br /> Bakersfield, CA 93309-1671 <br /> WORK PLAN FOR ADDITIONAL SITE INVESTIGATION, CHEVRON PIPE LINE <br /> COMPANY, FORMER LYOTH LOADING STATION, TRACY, SAN JOAQUIN COUNTY <br /> We have received your response to our comments on the work plan for the above-referenced site. <br /> We believe EPA Method 8015M is more appropriate for testing water samples than Method 418.1. <br /> Therefore, with the condition that all ground water samples be analyzed by EPA Method 8015M, <br /> we hereby approve the work plan. <br /> According to the proposed schedule, Phase I field work shall begin by 115rApp o San (two <br /> g o weeks <br /> after obtaining this approval). The Phase I interim report containing <br /> nd <br /> water samples and proposed monitoring well locations is due by 15 May 1994. This report shall <br /> include a time schedule to conduct the Phase II field work and submit a Phase II report. Please <br /> contact me at least 72 hours prior to startup of this field work so I can be present to observe <br /> procedures and split samples. <br /> If you have any questions, you may contact me at (916) 255-3054. <br /> DAVID E. JENKINS <br /> Associate Engineering Geologist <br /> DEJ:dej/ldj <br /> ckton <br /> cc: Ms. Margaret Lagorio, San Joaquin Public Health Services,VeSo ment D artment, Stockton <br /> Mr. Richard Larrouy, San Joaquin County Community p <br /> Mr. Bill Vizza, Director, Department of Public Works, Tracy <br /> Mr. Ronald E. Hoffman, Tracy <br /> Mr. Jeffory J. Scharff, Scharff & Greben, Sacramento <br />
The URL can be used to link to this page
Your browser does not support the video tag.