Laserfiche WebLink
No.Further Action Required Determination _ 5_ <br /> Former Lyoth Loading Station 19 November 2009 <br /> • Lyoth Offsite <br /> two primary areas as discussed above: along the former pipeline and beneath a former <br /> storage tank. <br /> • Dermal contact is possible by future residents and maintenance/trench excavation <br /> workers within the area of affected soil on both sites. Based on the risk assessment <br /> findings, the concentrations of residual crude oil do not present an unacceptable health <br /> risk for future onsite adult or child resident and/or for construction/trench workers. <br /> Avoiding development of the known affected areas on the sites by future excavations <br /> could reduce/minimize potential human contact with residual TPH compounds. <br /> Summary: <br /> The TPHc compounds detected in soil and groundwater are highly immobile, limited in extent, <br /> and will continue to attenuate naturally with time. Based on results of the sites investigations <br /> and the findings in the 1999/2002 HRA evaluations and the 2009 ERE report findings, it is <br /> anticipated that the residual crude oil remaining in soil and groundwater would not present an <br /> unacceptable threat to human health for the adult/child resident or for the construction/trench <br /> worker scenario. <br /> Consistent with SWRCB Resolution No. 92-049, an evaluation of alternative cleanup <br /> technologies other than natural attenuation are ineffective, not easily implemented, and/or <br /> disproportionally costly in comparison to benefits. <br /> The six project groundwater monitoring wells were properly destroyed in October 2009. <br /> The site specific SMP acts as a management reference designating Chevron as the <br /> responsible party if any affected soil or groundwater confirmed to be related to the historical <br /> pipelines is encountered during future construction/utility maintenance work. A copy of the <br /> SMP was provided to the owners of property determined to overlie the areas of affected <br /> soil/groundwater. <br /> No comments were received during the 30-day public notice period. <br />