My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26501
>
2900 - Site Mitigation Program
>
PR0505092
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 4:57:53 PM
Creation date
2/5/2019 4:48:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505092
PE
2960
FACILITY_ID
FA0006532
FACILITY_NAME
LYOTH LOADING STATION/CHEVRON
STREET_NUMBER
26501
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
26501 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> M.Stott Mansholt Chevron Environmental <br /> Ifta.— Ma Sr. Environmental Management Company <br /> Project Management 6111 Bollinger Canyon Rd, <br /> Specialist Room BRSYl3432 <br /> San Ramon,CA 94583 <br /> Tel(925)543-2353 <br /> L�L i,r. Fax(925)543-2323 <br /> — scott.mansholt@chevron.com <br /> SEP 2 2 <br /> ENVIROM;ly ti,i tiLAI-Tii <br /> PERMIT/SERVICES <br /> September 18, 2008 HPP_BTR MP#211.8 <br /> Banta Road-UPRR <br /> Agency Co spondencc RWQCB <br /> Mr. C.Dean Hubbard <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 1685 E. Street <br /> Fresno, California 93706 <br /> Subject: Update and Addendum for Soil and Groundwater Investigation Work Plan <br /> Banta Road-UPRR <br /> 26501 Banta Road <br /> Tracy, San Joaquin County,California <br /> Dear Mr. Hubbard: <br /> Per your recent communication with SAIC, field activities are being planned for the soil and <br /> groundwater investigation to be performed at the Banta Road—UPRR site. The Site Investigation <br /> Work Plan (March 29,2006) for this site was accepted by the RWQCB in a letter dated April 18, <br /> 2006. Access to the site was obtained on May 8,2008, and terminates on May 8,2009. <br /> Due to the length of time that elapsed while obtaining site access,the 2006 work plan was reassessed <br /> in light of Chevron's strategic direction for sites in the HPP-BTR Portfolio. The following <br /> modifications are proposed: <br /> • Soil and groundwater sampling will be performed in accordance with CTA guidelines (one <br /> shallow sample,one sample at most-affected depth, one sample just above groundwater if no <br /> affected soil is encountered,and one grab groundwater sample) instead of at 5-foot intervals <br /> and at lithologic changes as indicated in the 2006 work plan; <br /> • Two laterally distinct soil samples will be submitted for fuel-fingerprint analysis if affected <br /> soil is encountered, and; <br /> • One grab groundwater sample will be analyzed for General Minerals. <br /> Chevron currently anticipates completion of field activities and reporting by the end of 2008. <br />
The URL can be used to link to this page
Your browser does not support the video tag.