Laserfiche WebLink
0 <br /> Scott iv'tansholt—Chevron Environmental Managemen[Company May 26, 2004 <br /> Summary of Field Activities, SSJID Pipeline Page 3 of 3 <br /> decommissioned on February 19, 2004. Select photographs of field activities depicting the SSJID <br /> project activities are included in Appendix A. <br /> During the SSJID project, SAIC personnel conducted daily tailgate health and safety meetings, <br /> which included field staff from S&S, to review potential hazards in the vicinity of the excavation. <br /> SAIC reported no health and safety related incidents during the SSJID project. <br /> A soil sample for fuel fingerprint analyses was collected from the stockpile to characterize soil in <br /> the area. Results are attached in Appendix B. and conclude that the hydrocarbons in the sample <br /> are typical of many San Joaquin Valley(SJV)crudes and bunker fuels refined from SJV crudes. <br /> Should you have any questions or comments regarding the contents of this letter report,please <br /> call Todd Del Frate of SAIC at(916) 979-3741. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> 4aoiaeOleson To De] Fra , R.G. <br /> Staff Geoscientist nior Proje t Manager <br /> Enclosures: <br /> Figure l: Site Vicinity Map <br /> Figure 2: Site Map <br /> Appendix A: Photographs of Field Activities <br /> Appendix B: Fuel Fingerprint Laboratory Results <br /> References: <br /> Kleinfelder, 2004, Limited Soil Sampling and Analysis, SSJID C451/UPRR Bore Pit, Banta Road <br /> and UPRR Crossing,Tracy,California,January 20. <br /> A <br />