Laserfiche WebLink
• <br /> 1 • • <br /> The subcontractor will provide all equipment, labor, and materials to construct/install the monitoring <br /> wells and will return the work site to conditions equal to those of the immediately surrounding area. <br /> Cuttings will be drummed and transported to the All Pure Chemical facility to await future disposal. <br /> The attached price sheet will be completed and returned by end of business on May 14, 1999 to: <br /> Mr. Peter Loveridge <br /> IT Corporation <br /> 4585 Pacheco Boulevard <br /> Martinez, CA 94553 <br /> Telephone No. (925) 372-9100 <br /> Fax: (925) 372-5220 <br /> The Subcontractor will supply all materials, equipment, supplies, labor, and supervision to construct, <br /> install, and perform the services described in the Statement of Work and as itemized in the Price <br /> Sheet, below: <br /> Price Sheet <br /> Monitoring Well Installation/Abandonment <br /> All Pure Chemical Facility <br /> Tracy, California <br /> Line <br /> Item No. Description Unit <br /> 1 Mobilization/Demobilization lump sum $ <br /> 2 Drill, sample, install monitoring wells foot $ <br /> (including all well materials <br /> 3 Drums for soil cuttings drum $ <br /> 7 Soil Drum Transport drum $ <br /> 8 Truck Rental da $ <br /> 9 Steam Cleaning well $ <br /> TOTAL <br /> Standby attributed to IT Corporation. No payment will be made to the Subcontractor for standby <br />