My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:26 PM
Creation date
2/5/2019 4:57:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Andrew A. Woods <br /> 14 September 1998 <br /> Page 4 <br /> Task 3 -Conduct Laboratory Analyses <br /> All samples selected for analysis will be delivered with completed chain-of-custody forms to <br /> Excelchem Environmental Labs in Roseville, a State-certified laboratory. Samples will be <br /> analyzed for halogenated hydrocarbons by EPA 8010 with detection limits of 0.005 mg/Kg for soil <br /> samples and 0.5 ug/L for groundwater samples. For budgetary purposes we have included the <br /> following analyses: <br /> Soil Samples(3) -Two from wells and one from hydropunch location <br /> Groundwater Samples (3) -Two from wells and one from hydropunch location <br /> Field Duplicates(1) - One groundwater well <br /> Travel Blank(1) - One groundwater <br /> All samples will be analyzed on a standard 10 working—day turnaround time. <br /> Task 4—Prepare Groundwater Investigation Report <br /> Following completion of the laboratory analyses, a report presenting conclusions regarding the <br /> extent of VOCs present in groundwater at the Tray Facility and the local groundwater gradient and <br /> flow direction will be submitted. The report will also present a site map indicating well locations <br /> and the calculated groundwater gradient direction, tabulated summaries of soil and groundwater <br /> data, groundwater level measurements, well completion and soil boring logs, descriptions of <br /> sampling procedures, and copies of laboratory analysis reports. <br /> Task 5—Provide Project Management <br /> This task includes continued coordination of with All Pure's attorney for obtaining an easement for <br /> access to the Pombo property,responding to letters from the Regional Board,request for attendance <br /> at meetings with All Pure or the Regional Board, or other project management responsibilities. <br /> SCHEDULE <br /> Field work will commence within four weeks of All Pure Chemical Company completing an access <br /> agreement with Richard Pombo. Drilling and sampling activities will be completed within two and <br /> one-half weeks of commencing the field work. Laboratory analytical results will be completed on a <br /> two-week turnaround and the final report will be submitted to the Regional Board within four <br /> weeks of receiving the results from the laboratory. All Pure Chemical Company will be provided a <br /> draft copy of the report for review and comment prior to submitting the final report to the Regional <br /> Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.