My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:52 PM
Creation date
2/5/2019 4:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The current status of the ponds must be shown accurately on a map. The 1994 closure plan shows <br /> the pond in the southeast comer of All Pure's fenced area as being lined. This pond was not lined <br /> when I visited the site in January and March of 1996. The currant and past uses of each pond also <br /> must be reported. <br /> The closure plan needs to be complete. Appendices A and B :vere missing from the closure plan. <br /> Of particular importance is Appendix A which includes the i; ell logs for the four monitoring wells <br /> on the All Pure facility. <br /> The closure plan should include the means of closure and ;ost closure r.: "c� for all pods to <br /> be closed. It is appropriate to include this now since WDks will not be issued for the ponds to be <br /> closed. The 1994 closure plan stated that All Pure intended to build a warehouse on top of the site <br /> of the closed ponds. If this is still planned, a schedule for construction should be included. If the <br /> building will not be constructed for some time, if the building is not planned, or if the building will <br /> not cover the area of all ponds closed, then All Pure needs to prepare an alternative plan for post <br /> closure maintenance of the ponds. <br /> Additional details which must be provided in the closure plan include the method of emptying the <br /> ponds, method of soil sampling, analyses to be performed on the soil samples, and a regrading plan. <br /> A schedule for closing the ponds is needed, including dates for emptying the ponds, soil sampling, <br /> reporting results of the sampling with a work plan to remove or remediate any contaminated soils, <br /> and regrading. <br /> Please submit a revised closure plan which addresses the above comments no later than 7 June <br /> 1996. If you have any questions you may call me at(916) 255-3048. <br /> V <br /> �( POLLY L1WRY <br /> Associate Engineering Geologist <br /> PAL:pal/lsb <br /> cc: San Joaquin County Public Health Services, Stockton <br /> Mr, Tim Vickers, All Pure Chemical Company, Tracy <br />
The URL can be used to link to this page
Your browser does not support the video tag.