Laserfiche WebLink
LL 'P!!RE WORKPLAN REVIEW -4--4- 30 October 1989 <br /> The revised Workplan should also include a time schedule for construction and completion <br /> of the monitoring wells, the first and subsequent sampling rounds, and for a Technical <br /> Report, evaluating the results and proposing further work, if necessary, to define the <br /> extent of contamination. This Technical Report should include at least three rounds of <br /> sampling, construction details and field logs of the wells, and QA/QC on all analytical <br /> data and interpretation of the data. If the Report verifies that chloroform <br /> contamination, All Pure will need to submit a proposal to retrofit or close the ponds <br /> to meet Subchapter 15 requirements. <br />