My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:52 PM
Creation date
2/5/2019 4:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> July 10, 2013 <br /> Page 2 of 3 <br /> RE: MW-2 Well Destruction Work Plan <br /> Olin Chlor Alkali Facility, 26700 South Banta Road, Tracy, California <br /> The Site-specific Health and Safety Plan (HASP) will be updated for use by personnel implementing <br /> the Work Plan. The HASP will address the proposed activities. A copy of the HASP will be <br /> available on-Site at all times. The subcontractor(s) performing the field activities will be provided a <br /> copy of the HASP prior to initiating field activities. The on-Site subcontractors will also be required <br /> to maintain their own HASP. <br /> Task 2 — Monitoring Well Abandonment <br /> Well MW-2 is a 4-inch-diameter polyvinyl chloride (PVC) monitoring well with a total depth of 25 feet <br /> below ground surface (bgs). A copy of the well construction log is included as an attachment. Well <br /> MW-2 will be destroyed by over-drilling using hollow stem augers. Well casing and installation <br /> material will be removed by advancing augers to the total depth of the well. Augers will be of equal <br /> or greater outside-diameter than those used to install the well to ensure the complete removal of <br /> the well material. The resulting borehole will be backfilled with cement-grout slurry through a tremie <br /> pipe. The surface completion will be removed and the ground surface will be repaired to match <br /> surrounding conditions to the extent possible <br /> Well abandonment will be performed by Gregg Drilling and Testing of Martinez, California (C-57 <br /> License #485165). Stantec will provide an on-Site geologist to oversee Gregg Drilling and <br /> document the well destruction activities. <br /> Well abandonment activities will follow applicable guidelines established in the California <br /> Department of Water Resources (CDWR) Bulletin 74-81, (1981), and CDWR Bulletin 74-90 (1991). <br /> Task 3 — Investigation Derived Waste Disposal <br /> Wastes generated during the over-drilling of the monitoring wells will be stored in 55-gallons drums. <br /> The drums will remain on-Site pending receipt of analytical data from the laboratory for profiling <br /> purposes. The analytical results will be used for waste profiling and disposal evaluation. <br /> Task 4— Reporting <br /> Documentation of the well abandonment will be submitted as part of the 2013 Semi-Annual Report. <br /> Documentation will include a brief written summary, waste profile results, permits, and other <br /> pertinent information. <br /> State of California Well Completion Reports (DWR Form 188)will be submitted to the California <br /> Department of Water Resources. <br /> SCHEDULE <br /> Stantec proposes to abandon well MW-2 in July 2013. We anticipate that the well abandonment <br /> will require approximately one day to complete. <br /> One Team.Infinite Solutions. <br /> iApioneer\p1oneer-tracy\2013 well abandonment\work plan\well destruction work plan_071013_fnl.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.