NNE ) <br /> Conceptual Site Model and MRP Status <br /> The Conceptual Site Model (CSM) report was developed in response to a <br /> letter from the CVWB to Olin dated June 20,2017 (CVWB,2017a).The CSM <br /> recommended continued monitored natural attenuation (MNA)and <br /> modifications to the MRP.The CVWB provided comments on the CSM on <br /> November 09,2017(CVWB,2017b).A response to these comments was <br /> submitted on December 12,2017 (Amec Foster Wheeler,2017b). In a letter <br /> dated July 30,2018,the CVWB found the CSM and recommended remedy <br /> acceptable. <br /> The CVWB's July 30,2018 letter also issued the Revised MRP(CVWB,2018), <br /> which incorporated MRP revisions recommended in the CSM.The CVWB <br /> modified the MRP sampling schedule via electronic mail dated August 13, <br /> 2018,confirming that no sampling was required in 2018. <br /> The CVWB requested that Olin propose changes to the MRP in the <br /> September 23,2021 Response to Comments 2027 and 2079 Biennial <br /> Monitoring and Sampling Report(CVWB,2021).Olin submitted proposed <br /> changes to the MRP in the Proposed Revisions to Monitoring and Reporting <br /> Program letter,dated December 17,2021. <br /> The Revised MRP is based on a CVWB letter dated June 2,2022, and includes <br /> 8 monitoring wells(Figures 2 and 3)sampled biennially, as summarized in <br /> Table 1.Well construction details are presented in Table 2. <br /> Monitoring and reporting activities completed during the reporting period <br /> have been conducted in accordance with the Revised MRP. <br /> Groundwater LEVELS <br /> During the biennial monitoring conducted in March of 2023,groundwater <br /> levels were measured in eight monitoring wells.Water levels were measured <br /> from the top of the well casing to the nearest 0.01-foot using an electronic <br /> water level meter.Water level measurements are presented in Table 3. <br /> Upper Horizon well MW-6 is damaged,so water was measured in nearby <br /> Upper Horizon well MW-5 as a substitute until MW-17 is installed,as <br /> described in Response to Central Valley Regional Water Quality Control <br /> Board Review of 2079 Biennial Monitoring and Sampling Report(Wood, <br /> 2019). MW-6 will be decommissioned and replaced with MW-17 pursuant to <br /> the Revised Well Decommissioning and Replacement Well Installation <br /> Work Plan (Wood,2022). <br /> Groundwater Sampling and Analyses <br /> Groundwater samples were collected from eight wells (MW-5, MW-9, MW-10, <br /> MW-11, MW-12, MW-13, MW-14,and MW-15) in accordance with the Revised <br /> MRP.Groundwater samples could not be collected from MW-6 in either <br /> event because the well had been damaged, but MW-5 was sampled as a <br /> substitute. <br /> Groundwater samples were collected using the low-flow purging and <br /> sampling technique. During the purging procedure, measurements of field <br /> parameters including temperature,electrical conductivity,and pH of the <br /> purge water were recorded on sample collection logs.Once the field <br /> parameters stabilized,a groundwater sample was collected from the <br /> monitoring well using a laboratory supplied container.Groundwater sample <br /> https://woodplc.sharepoint.com/teams/olintracy/shared documents/general/03.0 docctrl/2021 biennial report/01_text/tcy 2021 biennial_text_rev.docx <br /> Page 2 <br />