Laserfiche WebLink
historically dry on-site wells MW-1, MW-3, MW-7,and MW-16 are planned to <br /> be destroyed in 2023. <br /> Data contained in this report are representative of Site conditions at the time <br /> the samples were collected. If you have any questions regarding the material <br /> presented in this report, please feel free to contact Mr. Dane Grimshaw at <br /> (408) 599-4030. <br /> Sincerely, <br /> WSP USA Environment&Infrastructure Inc. <br /> Christopher Kadi,CA PG 9195,CA CEG 2772 <br /> Project Manager <br /> Direct Tel.: (510) 206-6571 <br /> E-mail: Christopher.kadi@wsp.com <br /> DH N/CE/sc <br /> https://woodplc.sharepoint.com/teams/olintracy/shared documents/general/03.0 docctrl/2021 <br /> biennial report/01_text/tcy 2021 biennial_text_rev.docx <br /> CC: Mr. Dane Grimshaw and Mr. Brian Ukestad,Olin Corporation <br /> (Electronic Submission) <br /> Ms.Jessica Summey,Olin Chlor Alkali Tracy Plant (Electronic <br /> Submission) <br /> Attachments: <br /> TABLES <br /> Table 1 Monitoring and Reporting Program Order No. R5-2012-0813, <br /> Water Level Measurement and Analytical Requirements <br /> Table 2 Well Construction Details <br /> Table 3 Groundwater Elevation Data <br /> Table 4 Groundwater Flow Directions and Horizontal Hydraulic <br /> Groundwater Gradients <br /> Table 5 Vertical Hydraulic Groundwater Gradients <br /> Table 6 Detected Halogenated Volatile Organic Compounds, March <br /> 2021 <br /> Table 7 Results of Duplicate and Trip Blank Analyses <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Facility Plan <br /> https://woodplc.sharepoint.com/teams/olintracy/shared documents/general/03.0 docctrl/2021 biennial report/01_text/tcy 2021 biennial_text_rev.docx <br /> Page 8 <br />