Laserfiche WebLink
REFERENCES <br /> Amec Foster Wheeler Environment & Infrastructure, Inc. (Amec Foster <br /> Wheeler), 2017a. 2017 Conceptual Site Model Report, Olin Chlor <br /> Alkali Facility-Tracy, California.August 31. <br /> Amec Foster Wheeler, 2017b. Response to Central Valley Regional <br /> Water Quality Control Board Review of Conceptual Site Model <br /> Report: Olin Chlor Alkali Facility, 26700 South Banta Road, <br /> Tracy,San Joaquin County, California (Global ID SL185422914), <br /> dated November 9,2017. December 12. <br /> California Environmental Protection Agency, 2018. Maximum <br /> Contaminant Levels and Regulatory Dates for Drinking Water. <br /> October 2018.Available: <br /> https://www.waterboards.ca.gov/drinking wate r/certl i c/d ri n ki n <br /> gwater/documents/ccr/mcls_epa_vs_dwp pdf <br /> Central Valley Regional Water Quality Control Board (CVWB), 2017a. <br /> RWQCB, 2017. Central Valley Regional Water Quality Control <br /> Board Review of 2016 Annual Monitoring &Sampling Report, <br /> Olin Chlor Alkali Facility.June 20. <br /> CVWB, 2017b. Central Valley Regional Water Quality Control Board <br /> Review of Conceptual Site Model Report: Olin Chlor Alkali <br /> Facility,26700 South Banta Road,Tracy, San Joaquin County, <br /> California (Global ID SL185422914), dated November 9. <br /> CVWB, 2018. Central Valley Regional Water Quality Control Board <br /> Revised Monitoring and Reporting Program: Olin Chlor Alkali <br /> Facility,26700 South Banta Road,Tracy, San Joaquin County, <br /> California (Global ID SL185422914), dated July 30. <br /> SECOR International Incorporated, 2001. Feasibility Study/Remedial <br /> Options Evaluation Report. Prepared for Pioneer Americas, Inc. <br /> September 11. <br /> Wood Environment & Infrastructure Solutions, Inc., 2019. Biennial <br /> Monitoring and Sampling Report. May 30 <br /> Wood Environment & Infrastructure Solutions, Inc., 2019. Response to <br /> Central Valley Regional Water Quality Control Board Review of <br /> 2019 Biennial Monitoring and Sampling Report. December12. <br /> Wood Environment& Infrastructure Solutions, Inc., 2021. Biennial <br /> Monitoring and Sampling Report. May 24 <br /> Wood Environment& Infrastructure Solutions, Inc., 2022. Revised Well <br /> Decommissioning and Replacement Well Installation Work <br /> Plan.July 25 <br /> https://woodplc.sharepoint.com/teams/olintracy/shared documents/general/03.0 docctrl/2021 biennial report/01_text/tcy 2021 biennial_text_rev.docx <br /> Page 10 <br />