My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE D-1 <br /> HISTORICALLY DETECTED HALOGENATED VOLATILE ORGANIC COMPOUNDS <br /> 26700 South Banta Road <br /> Tracy,California <br /> Results reported in micrograms per liter <br /> Carbon <br /> Well No. Date Tetrachloride Chloroform 1,4-DCB 1,1-DCA BDCM PCE TCE DBCM Other <br /> MW-3 03/29/17 <0.5 37.2 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-3 09/28/17 <0.5/<0.5 32.6/32.5 <0.5/<0.5 <0.5/<0.5 <0.5/<0.5 <0.5/<0.5 <0.5/<0.5 <0.5/<0.5 <br /> MW-5 05/15/20 <0.5 4.7 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-5 03/17/21 0.038 J 19 <0.30 <0.20 <0.20 <0.50 <0.20 <0.20 Toluene=0.060 J <br /> MW-5 03/17/23 <0.20 2.7 <0.30 <0.20 <0.20 <0.50 <0.20 <0.20 Chloromethane=0.15 J <br /> MW-6 06/11/99 8.1 87 <0.5 1.0 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 08/11/99 2.5 150 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 11/22/99 1.7 100 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 02/23/00 7.1 1200 <0.5 0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 05/23/00 4.1 490 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 09/13/00 1.5 58 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 11/20/00 4.6 1200 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 02/07/01 4.2 990 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 05/09/01 3.9 670 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 08/07/01 2.8 550 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 11/21/01 2.7 470 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 02/06/02 2.9 470 <0.5 <0.13 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 06/20/02 0.34 57 <0.5 <0.17 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 08/12/02 0.48 70 <0.5 0.79 <0.5 <0.5 <0.5 <0.5 <br /> MW-6 11/19/02 <0.18 18 <0.5 <0.5 <0.5 <0.5 <0.5 <0.5 <br /> https://woodplc.sharepoint.com/teams/olintracy/shared documents/general/03.0 docctrl/2021 biennial report/01_text/tcy 2021 biennial_text_rev.docx Page 7 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.