My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Devra Lewis <br /> June 7,2001 <br /> Page 6 <br /> 3.3.2 Drilling and Soil Sampling Procedures <br /> SECOR proposes to advance soil borings for the purpose of determining subsurface lithology. Soil <br /> samples will be collected from the deepest boring at each location. Soil samples will be collected <br /> continuously in 5-foot intervals using a wireline continuous coring system(Moss Sampler) inside the lead <br /> auger. <br /> Soil samples collected from each boring will be periodically monitored by a SECOR geologist for <br /> parameters including odor, staining, volatile organic compounds(VOCs)using a photo-ionization detector <br /> (PID),color,grain size, and moisture content. Soil samples will be classified in accordance with the <br /> Unified Soil Classification System(USCS)as described in the ASTM Stand D 2488-84 "Description and <br /> Identification of Soils(Visual-Manual Procedure)"and recorded onto boring logs, which will be included <br /> in the final Summary Report. <br /> Augers and associated drilling and well construction equipment will be clean with a high pressure hot <br /> water washer prior to drilling each boring. <br /> 3.3.3 Monitoring Well Construction Procedures <br /> After sampling, 2-inch diameter monitoring wells will be constructed in each soil boring. The proposed <br /> construction and anticipated screen interval for each of the seven wells is listed below: <br /> TOTAL SCREEN <br /> LOCATION WELL ID ZONE DEPTH INTERVAL <br /> A MW-9 Upper 42 feet 22-42 feet <br /> A MW-10 Middle 58 feet 48-58 feet <br /> B MW-11 Upper 40 feet 25-40 feet <br /> B MW-12 Middle 60 feet 45-60 feet <br /> C MW-13 Upper 38 feet 23-38 feet <br /> C MW-14 Middle 57 feet 47-57 feet <br /> C MW-15 Lower 85 feet 70-85 feet <br /> The well depths and screen intervals listed above are approximate. Actual well construction will be based <br /> on the actual subsurface stratigraphy encountered at each location. Multiple wells at a single location will <br /> be spaced no less than 5 feet from each other. <br /> Boreholes for the Upper Zone monitoring wells(MW-9,MW-11, and MW-13)will be advanced <br /> approximately 10 to 15 feet below the first encountered groundwater, anticipated to be 20 feet bgs. <br /> Monitoring wells will be constructed within the hollow stem of the augers using approximately 10 to 15 <br /> feet of two-inch diameter,flush-threaded Schedule 40 PVC, 0.020-inch machine slotted screen extending <br /> from the bottom of the borehole and completed with blank casing to ground surface. A graded sand filter <br /> pack will be placed in the annular space from the bottom of the borehole to approximately one foot above <br /> the top of the well screen. One foot of bentonite pellets will be placed above the filter pack and hydrated. <br /> The remainder of the annular space above the bentonite pellet seal will be filled with a cement-bentonite <br /> (5%)grout mixture. <br /> H:\Pioneer-Tracy\WorkPlan2001\workplan.doc SECOR International Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.