My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wood. <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION.............................................................................................................................................1 <br /> 2.0 BACKGROUND...............................................................................................................................................1 <br /> 3.0 RATIONALE FOR DECOMMISSIONING GROUNDWATER MONITORING WELLS.................2 <br /> 4.0 DECOMMISSIONING METHODS.............................................................................................................2 <br /> 5.0 GROUNDWATER MONITORING WELL INSTALLATION..................................................................3 <br /> 6.0 MONITORING WELL DEVELOPMENT....................................................................................................4 <br /> 7.0 SAMPLE AND ANALYSIS PLAN ................................................................................................................4 <br /> 8.0 WASTE MANAGEMENT...............................................................................................................................4 <br /> 9.0 REPORTING .....................................................................................................................................................5 <br /> 10.0 SCHEDULE........................................................................................................................................................5 <br /> 11.0 REFERENCES....................................................................................................................................................5 <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan and Wells Proposed for Decommissioning <br /> APPENDIX <br /> Appendix A Groundwater Monitoring Well Installation Methods <br /> https://woodpIc.sharepoint.com/teams/OlinTracy/Shared Documents/General/03.0 DocCtrl/2022 Decomm WP/Revised Decomm i <br /> WP/01_text/2022_07_Tracy_Wood_Decomm WP_text.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.