Laserfiche WebLink
Geosyntec <br /> consultants <br /> Geosyntec HSE Procedures referenced herein are available on Geosyntec's HSE SharePoint site TASK HAZARD ANALYSIS <br /> and should be consulted,as appropriate,to ensure requirements are met.This THA has been (ver.4.0,9-8-2023) <br /> prepared per"HSE STD-105.Proiect Safety Management Handbook" <br /> Part A — PROJECT/TASK INFORMATION <br /> Project/Site Name: Olin Chlor Alkali Facility Project Number/Org: WR3313A <br /> Site Address: 26700 South Banta Road,Tracy, CA <br /> Task&Worksite Geosyntec will oversee the decommissioning of one 25-ft deep,2-in diameter groundwater monitoring well(MW-6 in <br /> Description: Work Plan)by pressure grouting and over-drilling in accordance with SJCEHD specifications.Work will be conducted by <br /> a C-57 licensed drilling subcontractor using a"Rhino"hollow-stem auger/direct-push combo rig. <br /> • MW-6 will be tagged to verify total well depth. <br /> • The well box will be removed,and the well will be over-drilled to a depth of approximately 25 feet using an <br /> HSA drill rig.The well casing,filter pack,and annual seal will be removed. Following over-drilling,Portland <br /> cement mixed with 3-5%bentonite gel(cement-bentonite grout)will be used to backfill the boring to <br /> approximately 1 foot below the ground surface.The upper 1 foot of each borehole will be backfilled with native <br /> material to match the surrounding ground surface. <br /> • MW-6 is located within Union Pacific Railroad right of way.An access agreement has been obtained. <br /> Geosyntec will hire a UPRR-approved flagging service to watch out for and direct train traffic during well <br /> destruction.Geosyntec staff will receive Union Pacific Roadway Worker Protection training(available on LINK <br /> portal)before start of the work. <br /> • In addition, previous boring locations GGW-1 and GGW-2, located in an orchard located to the east,will be <br /> surveyed. <br /> • Well destruction IDW will be temporarily contained on site in 55-gallon drums by the drilling subcontractor <br /> before being disposed offsite by a waste disposal subcontractor. <br /> • A porta-porty will be provided for the day of work. <br /> Geosyntec Personnel: Name Office Phone Cell Phone <br /> Site Safety Lead/Officer Nick Gross 510-285-2658 510-410-5395 <br /> ......................................................................................................... <br /> Task Technical Lead Zizheng Qu 510-285-2771 217-419-6079 <br /> Project Manager Jessica Ramirez 510-285-2682 408-515-2136 <br /> Project Director Eric Suchomel 510-285-2786 678-984-2337 <br /> ................................... <br /> Local HSE Coordinator Megan Ogburn 510-285-2774 510-828-1248 <br /> ............................................................................................................................................................................................................................................................................................................................................................................... ................................................................. ....................................... .......................... <br /> Regional HSE Manager Madison McLaughlin 858-716-2900 951-990-2888 <br /> ............................................................................................................................................................................................................................................................................................................................................................................. ................................................................. ....................................... .......................... <br /> Corporate HSE Director Bob Poll 813-379-4420 813-240-9231 <br /> On-Site ® Applicable; provide company name,work task and contact information for each Geosyntec <br /> Subcontractor(s): subcontractor below: <br /> ❑ Not Applicable Gregg Drilling—Jesse Pattison 925-313-5800 925-255-6263 <br /> Luk and Associates—Jackie Luk 510-724-3388 <br /> RailPros—(point of contact to be determined) 877-315-0513, ext. 116 <br /> Client,Contact(s): Olin Corporation—Dane Grimshaw NA 408-599-4030 <br /> ETHICS POINT HOTLINE US&Canada:844-231-3371 Australia:800-551-155 or 800.811.011 <br /> UK:800-89-0011 or 800-89-0011 Ireland:800-222-SS288 or 800-S00-000 <br /> Geosyntec C, Task/Project Name:Well Decommissioning/Former Olin Chlor Alkali Site,Tracy <br /> THA Date:4/28/2025 Page 1 <br /> consultants <br />