My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART C- HAZARD ANALYSIS and EQUIPMENT LIST(Basis for Field Team Safety Orientations and Onsite Safety Discussions) <br /> ONSITE TASK HAZARD ANALYSIS <br /> 1. TASKS/WORK ASPECTS 2. HAZARDS/RISKS 3. CONTROLS/SAFE WORK PRACTICES <br /> a.Mobilization to the Site with proper - Work delays -Be aware of site requirements and responsibilities including safety,labor,and PPE(see Section D.1) <br /> equipment and supplies - Improper work performance -Review THAs <br /> - Routine driving -Use routine safe/defensive driving practices(seat belts,safe speeds,eyes ahead,no tailgating,limit <br /> - Unfamiliar location distractions,no cell phone use while driving,clear windows,account for weather/road conditions,adequate <br /> sleep,other measures as appropriate).Plan the travel route before driving. <br /> C.2.SAFETY EQUIPMENT LIST <br /> D.1 BASELINE HAZARD PREPAREDNESS <br /> b.Set up work areas - Injury or exposure to public or other -Wear safety vest at all times;configure work area and support vehicles to minimize worker exposure to <br /> on-site personnel traffic hazards. In the public right of way,use traffic control to direct traffic around work area. <br /> - Slips/trips/falls -Route pedestrians and public around work area. <br /> - Traffic hazards -Walk slowly,eliminate distractions and look ahead while walking. <br /> - Special traffic hazards -Hire a flagger to manage rail traffic. <br /> D.1.BASELINE HAZARD PREPAREDNESS <br /> D.2 SPECIAL TRAFFICNEHICLE/TRANSPORTHAZARDS <br /> c.Outdoor work on UPRR right of - Traffic hazards -Wear safety vest at all times;configure work area and support vehicles to minimize worker exposure to <br /> way - Heat stress traffic hazards. In the public right of way,use traffic control to direct traffic around work area. <br /> - Biting/stinging insects -Stay hydrated,wear sunscreen,take frequent breaks in shade/cool location,as necessary. <br /> - Special traffic hazards -Be aware of the potential for ticks,stinging/biting insects(e.g.bees),and poisonous plants.Steer clear if <br /> observed.Wear long pants and long sleeves. <br /> -When working near a railway,wear a safety vest at all times and work with a designated flagger from the <br /> operating railroad. <br /> C.2.SAFETY EQUIPMENT LIST <br /> D.1 BASELINE HAZARD PREPAREDNESS; <br /> D.2 SPECIAL TRAFFICNEHICLE/TRANSPORTHAZARDS <br /> D.13. INFECTIOUS I PATHOGENIC BIOHAZARDS <br /> d.Auger drilling - Head/eye injury -Wear head and eye protection,as specified,and mechanical gloves when working near the rig. <br /> - Noise -Use hearing protection for times of elevated noise. <br /> - Potential exposure to contaminants -Route pedestrians and public around work area. <br /> - Injury or exposure to public or other -Follow safe work practices. <br /> on-site personnel C.2 SAFETY EQUIPMENT LIST <br /> - Struck-by,run-over,caught between D.1 BASELINE HAZARD PREPAREDNESS <br /> (pinch points),manual lifting,roll D.7 DRILLING <br /> over,fluid leaks,fuel hazards, <br /> suspend d equipment <br /> e.Grouting - Head/eye injury -Wear head and eye protection,as specified. <br /> - Hand injury <br /> Geosyntec I[> Task/Project Name: Well Decommissioning/Former Olin Chlor Alkali Site,Tracy THA ver.4.0 <br /> THA Date: 4/28/2025 Page 3 <br /> consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.