0 kn KLEINFELDER <br /> 5 REPORTING <br /> Upon completion of the field activities described in this workplan the protocols followed and <br /> observed during the abandomnent of MW-4 and the installation of MW-4r will be reported in the <br /> following quarterly groundwater monitoring report as an additional task undertaken during the <br /> quarter. The items included in the report will include the following: <br /> • A description of the field activities, observations, and protocols; <br /> • A graphical representation of wells; <br /> • A graphical representation of groundwater flow direction and gradient; <br /> • Lithologic logs and well construction diagrams; <br /> • Description and documentation of QA/QC procedures employed for field and laboratory <br /> work; and <br /> All information gathered during the study by Kleinfelder is considered confidential and will be <br /> released only upon written authorization from the client or as required by law. California law <br /> requires a person to inform the state if a situation is encountered that can be considered an <br /> immediate endangerment to the public's health or welfare and/or to the environment. Therefore, <br /> the client shall be contractually bound to make said disclosures in lieu of Kleinfelder, its owners, <br /> principals, employees or subcontractors. <br /> SCHEDULING <br /> Anticipated Schedule* Task <br /> (Business Days) <br /> 3 — 5 days Submittal of this workplan to RWQCB <br /> 5 — 10 days RWQCB review and comment <br /> 5 — 10 days Revisions and RWQCB approval of final workplan <br /> 5 — 10 days Permitting and subcontractor scheduling <br /> 5 — 7 days Monitoring well installation and development <br /> * Kleinfelder has no direct control over the time required by a regulatory agency to review and approve a workplan, <br /> approve permit applications or analytical turn around times. <br /> 34091.E01/ST05R040/JZ:Iv Page 6 of 9 <br /> ©2005,Kleinfelder,Inc. January 13,2005 <br />