My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BATES
>
7770
>
2900 - Site Mitigation Program
>
PR0523602
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 9:12:16 AM
Creation date
2/6/2019 9:10:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523602
PE
2965
FACILITY_ID
FA0015931
FACILITY_NAME
LINNE ESTATES LLC
STREET_NUMBER
7770
Direction
W
STREET_NAME
BATES
STREET_TYPE
RD
City
TRACY
Zip
95324
APN
24809009
CURRENT_STATUS
01
SITE_LOCATION
7770 W BATES RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINEELDER <br /> A-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br /> in a trisodium phosphate or non-phosphate detergent solution and rinsed in distilled water or <br /> steam cleaned prior to use in the next monitoring well. <br /> A-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br /> casings are usually surveyed and tied into permanent markers, if readily available. Survey <br /> accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the "z" coordinate. The depth <br /> to static groundwater is measured from a set location at the top of the PVC casing (usually the <br /> north rim). The depth of water is then subtracted from the elevation of the top of the well casing <br /> to provide a groundwater elevation for each monitoring well location. <br /> A-4 GROUNDWATER MONITORING <br /> A-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately 1/2 hour. <br /> 2. The water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well. <br /> 3. Water level measurements are made using a conductivity-based water-level meter. <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br /> well casing. <br /> The water level measurements are converted to elevations using the surveyed casing elevations. <br /> A-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc..) is decontaminated by steam cleaning, or by <br /> scrubbing in a trisodium-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse, prior to use in each well. Bailer cord is replaced prior to use in each <br /> well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level meter. <br /> 34091.E01/ST05R040/JZ:Iv Page A-5 <br /> C 2005,Kleinfelder,Inc. January 13,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.