My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012549
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
3500 - Local Oversight Program
>
PR0544106
>
ARCHIVED REPORTS XR0012549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 9:57:26 AM
Creation date
2/6/2019 9:51:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012549
RECORD_ID
PR0544106
PE
3528
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
02
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> 4 <br /> k <br /> RO <br /> Ma <br /> 1 <br /> i The bailer used to purge and sample the well was decontaminated prior to use by washing <br /> it in an alconox-water mixture with a stiff bristle brush,rinsing it with potable water and <br /> giving it a final spray rinse with distilled water. The well sounding device was <br /> decontaminated in a Amilas manner prior to first use and between uses at each well. The <br /> new thin nylon line-ltsed to lower the bailer into the well was disposed of after each use <br /> and not reused. Waver brought to the surface during the purging process and the water <br /> used for decontamir,• n of equipment was collected in a 55 gallon drum and stored <br /> onsite pending the grounOwater analytical results. <br /> All water sampling was performed in accordance with WESTON's site-specific health and <br /> safety plan,which was available onsite during field activities. A safety meeting was held <br /> with persomiel prior to starting work to review an6--:,ited sa ety hazards and emergency <br /> procedures. The field work for this project was pe,formed under Level D personal <br /> protection. <br /> kms. <br /> C n <br /> 1' <br /> W <br /> i/ lak <br /> � k <br /> Deas <br /> { <br /> RPf54k'FIAAmoi 0111]4: <br /> ew <br />
The URL can be used to link to this page
Your browser does not support the video tag.