My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2900 - Site Mitigation Program
>
PR0522015
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:00:09 AM
Creation date
2/6/2019 9:57:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522015
PE
2950
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
01
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Soil-Gas Investigation Workplan July 6, 2015 <br /> 200 N. Beckman Rd. Page 6 <br /> All drilling activities, sampling, and report will be supervised and prepared by a <br /> California-Registered Professional Geologist (#7503) and in accordance with <br /> procedures referenced within a Health and Safety Plan (signed in the field). <br /> A total of eight (8) soil samples were collected on June 19, 2015 at 2.5 ft bgs, <br /> 5.0 ft bgs, 7.5 ft bgs, and at 10.0 ft bgs from the soil boring designated S1 and <br /> collected at 2.5 ft bgs and at 5.0 ft bgs from the borings designated S2 and S3, <br /> and were analyzed for Total Extractable Petroleum Hydrocarbons as Hydraulic Oil <br /> (TEPH-HO) using EPA-Method 8015. <br /> A total of four (4) soil samples, were collected on June 19, 2015 at 2.5 ft bgs, 5.0 <br /> ft bgs, 7.5 ft bgs, and at 10.0 ft bgs from the soil boring designated S1 and were <br /> analyzed for Polychlorinated Biphenyls (PCBs) using EPA-Method 8082. <br /> A total of two (2) soil-gas samples collected from the soil-gas borings designated <br /> S4 and S5 at 5.0 ft bgs will be analyzed for Volatile Organic Compounds (VOCs), <br /> using EPA Method TO-15. <br /> REPORTING <br /> All drilling activities, sampling, and report will be supervised and/or prepared by a <br /> California-Registered Professional Geologist and in accordance with procedures <br /> referenced within a Health and Safety Plan (signed in the field). Following <br /> completion of the field work and/or initial sampling of the soil boring, a Report will <br /> be prepared and submitted to Mr. Jason Desalvatore presenting field activities, <br /> boring logs, laboratory analytical results of any soil and soil-gas samples taken, <br /> and conclusions and recommendations. <br /> Environmental and Remediation Services since 1992! <br />
The URL can be used to link to this page
Your browser does not support the video tag.