Laserfiche WebLink
Lithologic logging was completed from cuttings, examination of the material at the ends of the <br /> tubes, material in the shoe of the split spoon and soil extruded from unused sample tubes <br /> Lithologic logs of the soil borings are presented in Appendix B <br /> All on-site work was performed in accordance with WESTON's site specific health and safety <br /> plan (HASP) The field work was performed in level D personal protection A daily site health <br /> and safety briefing was conducted in accordance with the HASP <br /> MX\RPrstisjCMVCD!WP 08129194 <br />