Laserfiche WebLink
WELL INSTALLATION AND <br /> QUARTERLY GROUNDWATER MONITORING PROGRAM REPORT <br /> THIRD QUARTER 1992 <br /> 1.0 INTRODUCTION <br /> This report presents the methodology and results of groundwater sampling performed at the San <br /> Joaquin County Mosquito Abatement District (SJCMAD) facility located at 200 North Beckman <br /> in Lodi, California This report also serves to notify the San Joaquin County Environmental <br /> Health Division (EHD) that a fourth monitoring well was installed on the site and sampled as <br /> part of the third quarter 1992 monitoring effort. <br /> 2.0 INSTALLATION OF MW-4 <br /> On July 14, 1992, a new groundwater monitoring well was installed on the SJCMAD site. This <br /> well (MW-4) was installed on the site per the requirements of the EHD as stated in a letter dated <br /> February 10, 1992 from EHD to SJCMAD The purpose of this new well was to evaluate the <br /> groundwater conditions on the site in the downgradient portion of the site, as determined by <br /> local groundwater elevation data The well installation was conducted in accordance with the <br />' ROY F WESTON, INC. (WESTON) work plan entitled "Work Plan, Monitoring Well <br /> Construction and Groundwater Sampling and Analyses" dated April 1, 1992. This work plan <br /> was approved by EHD in a letter to SJCMAD dated April 17, 1992 A detailed description of <br /> the well installation field activities is presented in Appendix A. <br /> 3.0 GROUNDWATER MONITORING SUMMARY <br />' Monitoring wells MW-1 and MW-4 were sampled on August 25, 1992 Wells MW-2 and <br /> MW-3 were dry and therefore not sampled. <br /> The monitoring effort consisted of two tasks 1) field measurement of physical parameters and <br /> 2) the collection and analysis of water samples for specific analytes. One quality control sample <br />' was also collected The sample (coded MW-44) was collected to evaluate field decontamination <br /> procedures. A detailed description of the field activities is presented in Appendix B <br /> 3.1 Physical Parameters Summary <br />' Field measurement of physical parameters included groundwater elevation, temperature, pH and <br /> electrical conductivity These data are presented in Table 1. <br />' 3.2 Chemical Analysis Summary <br /> Concurrent with the measurement of the physical parameters, groundwater samples were <br /> collected and analyzed for BTEX and TPH-G. Analytical results indicate all water samples <br /> analyzed were below detection limits for all constituents tested. The quality control sample also <br /> showed no detectable BTEX concentrations The resultant data is summarized in Table 2 and <br /> the complete analytical report is presented in Appendix C <br /> 1 av9z <br />' MS/SICMAD WP <br />