My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000300
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2900 - Site Mitigation Program
>
PR0522015
>
ARCHIVED REPORTS XR0000300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:03:26 AM
Creation date
2/6/2019 10:02:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000300
RECORD_ID
PR0522015
PE
2950
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
01
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The bailer used to purge and sample the well was decontaminated prior to use by washing <br /> it in an alconox-water mixture with a stiff bristle brush, rinsing it with potable water and <br /> giving it a final spray rinse with distilled water The well sounding device was <br /> decontaminated in a similar manner prior to first use and between uses at each well The <br /> new thin nylon line used to lower the bailer into the well was disposed of after each use <br /> and not reused Water brought to the surface during the purging process and the water <br /> used for decontamination of equipment was collected in a 55 gallon drum and stored <br /> onsite pending the groundwater analytical results <br /> All water sampling was performed in accordance with WESTON's site-specific health and <br /> safety plan, which was available onsite during field activities A safety meeting was held <br /> with personnel pnor to starting work to review anticipated safety hazards and emergency <br /> procedures The field work for this project was performed under Level D personal <br /> protection <br /> 1 <br />' RPTSlS7CMAP WP OY!]3M2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.