Ile 2.0 PROPOSED SITE ACTIVITIES <br /> The proposed site activities will consist of constructing a new groundwater monitoring well <br /> (designated MW-4) downgradient from the former gasoline tank location, and sampling and <br /> analysis of the groundwater in the newly installed well for gasoline related constituents. <br /> Sampling of MW-4 will be conducted as part of the quarterly groundwater monitoring program <br /> currently in progress on the site. <br /> 2.1 General Requirements <br /> This work plan has been developed to conform to the Tri-Regional Recommendations and is <br />' structured to address the concern of the San Joaquin County EHD All work described below <br /> will be completed under the direction of a California Registered Geologist and all analytical <br />' work will be conducted by an analytical laboratory certified by the State of California <br /> 2.2 Well Location <br /> tThe new monitoring well will be located in a downgradient position with respect to the former <br /> gasoline tank and the other monitoring wells on the site as shown on Figure 2 For the purpose <br />' of this work plan, the downgradient position was determined to be toward the north-northeast <br /> based on groundwater gradient data for March 18, 1987 collected by another consultant <br /> Because there is at present no way to confirm this gradient data, it is possible that the previously <br /> reported gradient direction determined from data now five years old does not reflect current <br /> conditions Prior to constructing the new monitoring well, an additional effort will be made to <br />' verify the gradient direction onsite so that the new well will satisfy its intended purpose This <br /> effort will consist of rechecking the existing wells to determine if recent rams have raised the <br /> site water table enough to determine the current gradient In addition, other information sources <br /> such as published maps, etc. will be checked for current area-wide gradient data. If the gradient <br /> is found to be significantly different from that stated above, the new well location will be <br /> adjusted accordingly and the EHD will be advised If, due to the recent rains, all the wells <br />' onsite are found to contain water, then the need for a new well will be reevaluated <br />' 2.3 Monitoring Well Installation <br /> The monitoring well will be constructed by hollow stem auger drilling techniques with a 4-inch <br /> ' diameter PVC casing and a 20 foot screened section. It is estimated that the well total depth will <br /> be approximately 70 feet The screen will be located to set the top of screen at least three feet <br /> above the saturated zone A sand pack will be emplaced throughout the screened interval and <br /> ' will extend at least two feet above the top of the screen A bentonite seal will be placed above <br /> the sand and the annular space will be grouted above the seal to the surface with a five percent <br /> bentonite/cement grout The monitoring well will be completed in a flush mount chnstie box <br /> ' equipped with a locking cap. <br /> 0 <br /> ' K 3 �,M <br /> PI'S\SICMADWK PLN <br />