My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
300
>
2900 - Site Mitigation Program
>
PR0507767
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:57:16 AM
Creation date
2/6/2019 10:56:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507767
PE
2950
FACILITY_ID
FA0007750
FACILITY_NAME
CERTAINTEED
STREET_NUMBER
300
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
952403103
APN
04931006
CURRENT_STATUS
01
SITE_LOCATION
300 S BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAGE <br /> i-N-VIRONMENTAL CONSULTING <br /> ORIGINAL SENT VIA EMAIL <br /> March 29,2013 <br /> Mr.Jeff Henthorne <br /> Corporate HSE Supervisor <br /> Westlake Chemical Corporation <br /> 2801 Post Oak Blvd <br /> Houston,TX 77056 <br /> RE: Proposal for Environmental Due Diligence Assessment and Phase II Investigation <br /> CertainTeed Corporation <br /> 300 South Beckman Road <br /> Lodi,California <br /> Sage Proposal No.64-12-1 <br /> Dear Mr.Henthorne: <br /> Sage Environmental Consulting,L.P. (Sage)is pleased to present this proposal to Westlake <br /> Chemical Corporation(Westlake)for a limited Phase II Investigation to evaluate recognized <br /> environmental conditions(RECs), as well as other concerns identified in a previously completed <br /> Phase I Environmental Site Assessment(ESA).Working as the buyer's consultant, Sage will <br /> have only Westlake's interests in mind. <br /> Sage seeks to assist Westlake with a review of the plant's environmental history and determine <br /> and conduct the necessary soil and/or groundwater investigation to establish a baseline for the <br /> existing environmental conditions at the plant.Westlake's goal is to determine the environmental <br /> conditions at the plant that exist at the time of purchase to establish any existing liabilities to <br /> CertainTeed Corporation and provide a baseline which will separate pre-existing conditions from <br /> Westlake. <br /> Sage has been provided with a copy of the ESA conducted by ENVIRON International <br /> Corporation in December 2012, a January 14, 1998 Phase II investigation prepared by <br /> Environmental Liability Management,Inc., and an October 7, 1997 Interoffice Memo discussing <br /> a pre-acquisition site visit to the Lodi plant. <br /> Scope of Work <br /> Based on review of the provided information and Westlake's instructions, Sage has prepared the <br /> following scope of work. Sage has separated the scope of work to differentiate that work <br /> necessary to close out an REC or other concern identified in the ENVIRON Phase I ESA from <br /> the work necessary to establish a baseline of the existing environmental conditions at the plant. <br /> Sage will rely on ASTM and EPA approved standards and methods to conduct this work. <br /> Sage Environmental Consulting,LP-600 Chastain Road,Suite 320-Kennesaw,Georgia-30144-678-431-0130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.