My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BEECHNUT
>
800
>
2900 - Site Mitigation Program
>
PR0518187
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 2:18:16 PM
Creation date
2/6/2019 2:06:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518187
PE
2960
FACILITY_ID
FA0013750
FACILITY_NAME
CPL/RENOWN/TAOC
STREET_NUMBER
800
Direction
W
STREET_NAME
BEECHNUT
City
TRACY
Zip
95376
APN
23407004
CURRENT_STATUS
01
SITE_LOCATION
800 W BEECHNUT
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Bakrania, Bella P [BELLA.P.BAKRANIA@saic.com] <br /> Sent: Friday, January 16, 2004 10:49 AM <br /> To: Mike Infurna [EH] <br /> Subject: TAOC Tracy Pump Station vs. Tracy Pump Station <br /> Dear Mike, <br /> We are converting the drawing files for"TAOC Tracy Pump Station (Renown)" so we can get you a site plan, to <br /> help you distinguish this site from the"Tracy Pump Station". The APN number for TAOC Tracy Pump Station is <br /> on the transmittal letter for the soil boring permit application package. I sent you the application package this <br /> week for two soil boring permits, and one check for$178 by FedEx. Please replace the first permit application <br /> package I sent you with the second package. I sent the first package before I spoke with you on the phone. The <br /> encroachment permit is in the works and I will send it to you immediately upon receipt from Public Works. We are <br /> still planning three field days at Tracy Pump Station = Day 1: Jan 26 -Utility locating, Day 2: Jan 29 - Drilling, Day <br /> 3: Jan 30 - Drilling. Bryan Turner and I will be visiting Mr. Dobler and the site next week for pre-field. Thank you <br /> and please do not hesitate to contact me if you have further questions. <br /> Bella Bakrania <br /> SAIC -Sacramento <br /> 3800 Watt Avenue, Suite 210 <br /> Sacramento,CA 95821 <br /> tel: 916.979.3747 <br /> fax: 916.979.3735 <br /> email: bakraniabna,saic.com <br /> 1/20/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.