Laserfiche WebLink
OEOMATAIX <br /> Mr. C. Dean Hubbard <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> May 24, 2004 <br /> Page 4 <br /> After analytical results have been received, Geomatrix will prepare a report documenting <br /> field activities, and analytical results. The report will include a description of field and <br /> analytical methods, tables, and figures presenting analytical results, and a discussion of the <br /> results of the investigation. <br /> SCHEDULE <br /> It is anticipated that field activities can commence approximately three weeks after receipt of <br /> work plan approval and acquisition of property access, depending on subcontractor availabil- <br /> ity. Analytical results will be received approximately two weeks after samples are submitted <br /> and a report can be submitted to the RWQCB approximately eight weeks after the receipt of <br /> analytical results. <br /> Please contact either of the undersigned if you have any questions or require any additional <br /> information. <br /> Sincerely yours, <br /> GEOMATRIX CONSULTANTS,INC. <br /> ryan Turner Gary R. Foote,R.G. #5044 <br /> Project Geologist Principal Geologist <br /> BHT/pp <br /> 1ADoc_Safc%6000s\662&2004 Work Plan\990 Beechnut Reponse and WP.doc <br /> Attachments: Figure 1: Site Location Map <br /> Figure 2: Historical Soil Boring, Grab Groundwater, and Test Pit Locations <br /> Figure 3: Proposed Sampling Locations <br /> cc: Scott Mansholt, ChevronTexaco <br /> Michael Infurna, SJCEHD <br />