My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BELLA LAGO
>
1699
>
2900 - Site Mitigation Program
>
PR0523856
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 2:29:26 PM
Creation date
2/6/2019 2:27:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523856
PE
2965
FACILITY_ID
FA0016065
FACILITY_NAME
OAKWOOD SHORES
STREET_NUMBER
1699
STREET_NAME
BELLA LAGO
STREET_TYPE
WAY
City
MANTECA
Zip
95337
APN
24152013
CURRENT_STATUS
01
SITE_LOCATION
1699 BELLA LAGO WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 1 of 2 <br /> Michael Escotto [EH] <br /> From: John Yoakum [EH] <br /> Sent: Tuesday, October 08, 2013 1:31 PM <br /> To: Michael Escotto [EH] <br /> Cc: Rodney Estrada [EH] <br /> Subject: FW: 1699 Bella Lago Way - Oakwood Lake <br /> Mike, <br /> There is actually 9 hours that he has paid for, and we should use, for this phase of this project. <br /> If you have to run off for an hour or so, and they seem to be able to handle this, it is ok to leave and <br /> come back. <br /> Please do not check in, say "it looks good to me" and just sign off on the project. <br /> They come back to me later and complain that the other inspector does not stick around and charge <br /> them, so why do I? <br /> It makes it harder for me to do my job properly. <br /> Try to keep track of; <br /> The time when they set up on a well. <br /> The well number and depth, (they are all 20' in this case). <br /> When the bottom is knocked out <br /> The amount of grout they use <br /> And when the last of the grout goes down the hole, or when the well destruction is completed. <br /> I picked you because you seemed interested in picking up a little more work and in seeing what I am <br /> doing on this side. <br /> This should be a very easy job so relax and enjoy it. <br /> The crew and geologist are easy to work with. <br /> If you have any questions, I should be near my cell, so give me a call. <br /> Johnny <br /> From: John Yoakum [EH] <br /> Sent: Tuesday, October 08, 2013 1:16 PM <br /> To: 'Doug Heard' <br /> Cc: Michael Escotto [EH] <br /> Subject: RE: 1699 Bella Lago Way - Oakwood Lake <br /> Doug, <br /> You are on the calendar for Thursday October 10, 2013. <br /> 1 have arranged for Mike Escotto to be your inspector. <br /> Mike's cell number is (209) 481-9456. <br /> 1 anticipate that you will begin destructions at about 9:00 am, and that it will take at least 4 hours, <br /> (possibly 6). <br /> You intend to use the "popsicle" method which involves lifting the casing and seal, knocking a hole in <br /> the bottom plug. <br /> After knocking out the plug, you will fill the casing with neat cement and then lift the entire casing, and <br /> screen out of the hole. <br /> If the grout has settled more than 3' below the surface, you will top it off and cover with earth. <br /> 10/9/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.