Laserfiche WebLink
0 ! <br /> Date Begin-End: 4/09/2013 Drill Company: V&W Drilling BORING LOG KB-3 <br /> Logged By: D.C. Drill Crew: Frank <br /> Hor.-Vert.Datum: Not Avellahle Drill Equipment: Geoprobe <br /> Exploration Plunge:-90 degrees Exploration Method: Push Probe <br /> Weather: Warm-Sunmr Auger Diameter: 2 in.O.D. <br /> FIELD EXPLORATION <br /> Z S S <br /> a > a a <br /> n E n $r No Coordinates Available <br /> y & _ No Elevation Available <br /> ~ Z 20: <br /> o O $ <br /> m 1 y <br /> n 0 <br /> E � n Surface Condition:Asphalt <br /> �Of O <br /> NA ASPHALT <br /> 0.0 <br /> Fat CLAY(CH):homogenous,high plasticity fines,dark brown,moist firm,trace silt no odor <br /> NA <br /> KB•138 NA 0.0 <br /> Sandy SILT(ML):fine to medium grained,medium plasticity,fines,yellowish brown,moist soft,trace Gay,no odor <br /> NA <br /> 5 IIA <br /> KB-3-72 NA 0.0 <br /> GROUNDWATER LEVEL INFORMATION: <br /> The exploration was terminated at approximately 6 ft.below ground Groundwaterwas not encountered dunng drilling Drafter complegon. <br /> surface GENERAL NOTES: <br /> 10 <br /> 0 <br /> O <br /> 15 <br /> i <br /> s <br /> w� <br /> Y_ <br /> m <br /> � <br /> 20- <br /> 25— <br /> z <br /> 025z <br /> N� <br /> o <br /> K <br /> 30 <br /> 0 <br /> N <br /> Cl <br /> r PROJECT NO.: 133386A BORING LOG KB-3 PLATE <br /> 2 DRAWN BY: G.G. <br /> KLE/NFELDER CHECKED BY: D.H. BENJAMIN HOLT DRIVE A-5 <br /> Bright People.Right Solutions. DATE: 4117=13 IMPROVEMENT PROJECT <br /> GETTYSBURG PLACE TO PACIFIC AVENUE <br /> REVISED: STOCKTON,CALIFORNIA PAGE: 1 of 1 <br /> o. <br />