Laserfiche WebLink
0 • <br /> Date Begin-End: 4109/2013 Drill Company: V&W Drilling BORING LOG KB-6 <br /> Logged By: D.C. Drill Crew: Prank <br /> Hor:Vert.Datum: Not Available Drill Equipment: Geoprobe <br /> Exploration Plunge:-90 degrees Exploration Method: Push Probe <br /> Weather: Warm-Sunny Auger Diameter: 2in.O.D. <br /> FIELD EXPLORATION <br /> JE_ E <br /> n E8 No Coordinates Available <br /> No Elevation Available <br /> dE Sudace Condition:Asphalt <br /> qp❑ N d U' <br /> NAASPHALT <br /> Pat CLAY(CHt high plasticity fines,dark brown,moist,firm,tram sand,fine grained,no odor <br /> NA <br /> K&8-38 NA <br /> Sandy SILT rylr fine to medium grained,low plasticity fines,yellowish broom,moist,soft,homogenous,some <br /> NAday.no odor <br /> 5 NA <br /> KB-e-72 NA 0.01 _ <br /> GROUNDWATER LEVEL INFORMATION: <br /> The exploration was terminated at approximately 6 n.below ground Groundwater was not encountered during drilling or after completion. <br /> surface GENERAL NOTES: <br /> 10 <br /> 0 <br /> 15 <br /> S <br /> 0 <br /> u- <br /> LL1 <br /> m <br /> c9 <br /> 20- <br /> 30- <br /> PROJECT NO.: <br /> 3PROJECTNO.: 133385.4 BORING LOG KB-6 PLATE <br /> 9 DRAWN BY: G.G. <br /> ('KLE1NFELj0HA? CHECKED BY: D.H. BENJAMIN HOLT DRIVE A-8 <br /> \�Bright People. Right Solutions. DATE: 4117/2013 IMPROVEMENT PROJECT <br /> t� REVISED: GETTYSPACIFICAVENUE <br /> STOCK ON,CALIFORNIA <br /> p PAGE: 1 oil <br />