My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C A M B R I A <br /> • If MTBE concentration data from these deep wells agree with the grab groundwater data <br /> from the CPT investigation, then we will consider the grab groundwater data validated and <br /> proceed with installation of additional deep groundwater monitoring wells (phase two). <br /> • If after sampling the two deep groundwater monitoring wells for a year and MTBE has not <br /> been detected above MCLS,then we would consider the grab groundwater data from the CPT <br /> investigation not valid and vertical delineation complete. Additional deep monitoring wells <br /> would not be installed. <br /> ® • If groundwater samples from the deepest monitoring wells at a specific location at the site <br /> are consistently above MCLS, additional vertical delineation may be warranted. Proposing <br /> additional vertical delineation is premature at this time. Once we have verified that MTBE is <br /> present at depth we will propose additional assessment as warranted. <br /> Installation of both phases of wells at this time is not a rational scientific approach to <br /> investigating the site. As is common to most investigations at service stations, data is collected <br /> during one phase of investigation to be used to determine scope of the next phase of <br /> investigation. The current proposal is consistent with this approach. We have collected data <br /> from a previous investigation that may not be representative data. Therefore we are proposing to <br /> validate some of this data before proceeding with a larger,more expensive, scope of work. <br /> If further explanation of this phased approach is necessary then perhaps we should schedule a <br /> meeting to discuss it further. In the mean time we will submit a drilling permit application for <br /> the proposed work at this site. <br /> 1015 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.