My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HPOALTH SERVICES oP �o <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION ` <br /> Karen Furst, M.D., M.P.H., Health Officer. <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 "OR <br /> 209/468-3420 <br /> KAREN PSERVICES LLC <br /> R <br /> EQUINA SEFILE COPY <br /> PO BOX 7869 <br /> BURBANK CA 91510-7869 <br /> RE: Equilon (Shell branded Service Station #204-7524-4) Site Code:1883 <br /> 3011 W. Ben Holt Dr. RO#: 0000486 <br /> Stockton, CA., 95207 <br /> WORK PLAN: "Site Investigation Work Plan" DATED: June 22, 2001 <br /> PREPARED BY Cambria Environmental Technology, Inc. — Joe Neely, R.G. <br /> APPROVED <br /> DISAPPROVED C. <br /> ADDENDUM NEEDED ❑ Submit by: n/a <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN <br /> [H&S 25299.37,subd(c)(3)1: <br /> -onsite deep soil boring (CPT) to collect soil and groundwater samples for vertical <br /> delineation, <br /> -install four (4) onsite monitoring wells in shallow/first aquifer for lateral groundwater <br /> petroleum plume delineation, <br /> -analyze samples for TPHg, BTEX, and seven (7) oxygenates, <br /> -report of findings to PHS-EHD. <br /> COMMENTS AND CONDITIONS: <br /> -collect and analyze adequate number of soil samples for support of conclusions <br /> due in pending PAR, <br /> -TPH-g by EPA Method 8015m or 8260 (not 8020), <br /> -install CPT and all four MWs by July 31, 2001 (30 days), <br /> -initial groundwater samples from MW-6,7,8,9 to have TPH-d analysis (8015m), <br /> -complete report of findings to PHS-EHD by September 17, 2001 (45 days). <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN <br /> [H&S 25299.37,subd(c)(3)1: <br /> -none. <br /> DATED: June 29, 2001 . By:� <br /> Michael Info a, nior E S (209) 468-3454 <br /> Faxed to consultant on: 6/29/01. <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.