My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
envlYOSo <br /> collected when over-excavation is complete. These samples will be analyzed for TPPH, <br /> BTEX,Total Lead and MTBE on a 24-hour turnaround time frame. <br /> Task 6- Soil Stockpiling and Sampling <br /> Soils excavated from the tank pit and product line trenches, and any potential over- <br /> excavation soils will be stockpiled on-site. Enviros will collect one soil stockpile <br /> composite sample (consisting of four sub-samples) for every 100 cubic yards of soil <br /> removed during excavation activities. Stockpile samples will be submitted to a California- <br /> approved laboratory for chemical analysis for TPPH, BTEX, Total Lead and MTBE. A <br /> 24-hour turnaround time frame will be requested for stockpile sampling results. <br /> Sample results and a waste profile form will be submitted to Forward Landfill in Stockton, <br /> California. Upon acceptance, the soil will be transported to Forward by Manley and Sons <br /> Trucking of Sacramento, California. <br /> Task 7 -Report Preparation <br /> Following the receipt of chemical analytical data,Enviros will prepare a Tank Removal <br /> Report documenting field activities and presenting chemical analytical results. <br /> Scheduling <br /> Construction activities are scheduled to begin October 21, 1996. The corrective action <br /> phase of this work(tank removal and excavation and disposal of soil) is scheduled to be <br /> completed within the first three weeks of the project(i.e. by November 8, 1996). <br /> Completion of the entire project and re-opening of the station is scheduled to be complete <br /> by December 16, 1996. Weather and unforeseen construction conditions may affect this <br /> schedule. <br /> If you have any questions regarding the contents of this document,please call Diane <br /> Lundquist at (707) 935-4852. <br /> Sincerely, <br /> Enviros, Inc. <br /> Joe W. Neely QRpFESS(nyq <br /> Prcgq G/eo-�/l/oJgist ye� tiN. LU,y�QGF�y <br /> Diane M. Lund t, P.E. No. 046725 =y <br /> Senior Engineer <br /> C46725 pf�CA�F���\� <br /> 96378 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.