My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TABLE #1 • <br /> SAMPLING FOR ROUTINE TANK REMOVALS <br /> 10 AUGUST 1990 <br /> CASE A: WATER NOT PRESENT IN TANK PIT <br /> 1) REMOVE A MAXIMUM OF TWO FEET OF NATIVE SOIL BEFORE SAMPLING. <br /> Z) IF AREAS OF DEVIOUS CONTAMINATION ARE OBSERVED, THEY ARE TO <br /> BE SAMPLED . <br /> I MINIMUM NUMBER I LOCATION <br /> IO <br /> I TANK SIZE OFSOIL SAMPLES I SOIL SAMPLES I <br /> LESS THAN 1000 GAL. I ONE PER TANK (FILL OR PUMP END OF TANKI <br /> 1 1000-10, 000 GAL. I TWO PER TANK I ONE AT EACH END OF TANKI <br /> I I <br /> 1 GREATER THAN I THREE OR MORE I ENDS AND MIDDLE OR i <br /> 1 10 , 000 GAL. I PER TANK I GENERALLY SPACED ALONG I <br /> I I I THE LENGTH OF THE TANK I <br /> I <br /> PIPING I ONE I EVERY 20 LINEAL FEET j <br /> CASE B: WATER PRESENT IN TANK PIT <br /> 1) THE TANK PIT MAY BE PURGED AND ALLOWED TO REFILL BEFORE <br /> SAMPLING. THE PURGED WATER IS TO BE HANDLED CORRECTLY. <br /> Z) THE WATER SAMPLE IS TO BE REPRESENTATIVE OF WATER IN THE <br /> TANK PIT. <br /> I MINIMUM NUMBER I LOCATION I MINIMUM NUMBER <br /> OF <br /> TANK SIZE I OF I OF <br /> I SOIL SAMPLES I SOIL SAMPLES I WATER SAMPLES I <br /> I I <br /> 110, 000 GAL. I IFROM WALL NEXT I ONE i <br /> I OR LESS I TWO ITO TANK ENDS ATI <br /> IQSINGLE TANKI ISOILIGROUND I I <br /> (WATER INTERFACE1 <br /> I I I I 1 <br /> IGREATER THAN I IFROM WALL NEXT I <br /> 110, 000 GAL. I FOUR ITO TANK ENDS I ONE I <br /> OR I IAT SOILIGROUND I <br /> ( TANK CLUSTER I IWATER IN'TERFACEI <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.