My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORO <br /> FUGRO WEST, INC. 0� _ <br /> hP 22 P1 2^ <br /> p 1050 Melody Lane,Suite 160 <br /> Roseville,California 95678 <br /> April 18, 1994 Tel: (916)782-2110 <br /> FAX: (916)786-7830 <br /> Mike Infurna <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 445 N. San Joaquin Street <br /> Post Office Box 338 <br /> Stockton, California 95201-0388 <br /> Subject: Shell Service Station (WIC No. 204-7524-4404) <br /> 3011 West Benjamin Holt Drive <br /> Stockton, California <br /> Dear Mr. Infurna: <br /> Attached for your use is our "Site Investigation/Monitoring Well Installation Results <br /> Report," with attached "First Quarter 1994 Groundwater Monitoring Report," for the <br /> subject site. Per our March 31, 1994 telephone conversation, submittal of the report was <br /> delayed slightly by the sampling schedule of the new wells and the omission of ethylene <br /> dibromide (EDB) from the groundwater analytical report. <br /> Fugro West, Inc. supervised the drilling and installation of the three new wells on <br /> January 18, 1994. Monitoring and sampling of the new wells was performed by Blaine <br /> Tech Services, Inc. of San Jose, California, on February 15, 1994. Fugro received the <br /> monitoring report from Blaine Tech on March 21, 1994, but the report did not include the <br /> analytical results for EDB, as required by your office. The analytical report was then <br /> revised to include EDB and forwarded to Fugro by the laboratory. <br /> We appreciate your interest in the site and trust the attached reports meet your needs. <br /> If you have any questions, please call us at (916) 782-2110. <br /> Sincerely, <br /> Kurt B. Martin <br /> Project Manager <br /> KBM/sdh <br /> Attachments "Yql <br /> cc: D.T. Kirk, Shell Oil Company qq >`C <br /> 93479046.DLT U.S, operating companies in California, Louisiana, Missouri, and Texas <br /> International operating companies in Australia, Belgium, Brunei, Canada, Germany, Hong Kong, Indonesia, Japan, <br /> Malaysia, The Netherlands, Saudi Arabia, Singapore, United Kingdom, and United Arab Emirates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.