My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated:2/8/01 #EMEDIAL OVERSIGHT PROGRANO Report#: 7540 <br /> Printed: 2/8/01 SITE DATA Page#: 1 <br /> Remedial Oversight Record 1 00000486 Facility ID: FA0002111 Site Code: 1683 RWQCB Site ID: <br /> Location <br /> Site Name: SHELL SERVICE 204-7524-4 Substance: 8006619 Petroleum: Y <br /> Site Contact: KAREN PETRYNA District: 002-MARENGO,DARIO <br /> Site Address: 3011 W BENJAMIN HOLT DR Location Code: 01 -STOCKTON <br /> x STREET,1-5 FREEWAY <br /> STOCKTON CA 95207 <br /> Phone: 209-477-1703 Fax: Email: <br /> Case Type: A-Aquifer polluted APN: Reported: 4/13/90 <br /> Fund Source: F-Federal Confirmed: 12/26/90 <br /> Assigned to: EE0000684-INFURNA Latitude: X-Coordinate: 100-017-01 <br /> Current Status: Longitude: <br /> YLoordmate: Emergency Response: <br /> RP Search:S-Solvent RP Search Started: 3/4/92 RP Search Ended: 3/28/92 <br /> Preliminary Assessment:C-Completed Preliminary Assessment Started:12/26/90 Preliminary Assessment Ended:1/18/94 <br /> Remediation Investigation:U-Underway Remediation Investigation Started:1/18/94 Remediation Investigation Ended: <br /> Remedial Action: Remedial Action Started: Remedial Action Ended: <br /> Post Remediation Monitoring: Post Remediation Monitoring Started: Post Remediation Monitoring Ended: <br /> Case Closed: Case Closed Date: <br /> Contaminated Soil left in Place: <br /> Remedial Action Taken#1: Enforcement Type: 1 -NOR ISSUED <br /> Remedial Action Taken#2: Enforcement Action Taken: Y Enforcement Action: <br /> Remedial Action Taken#3: <br /> Remedial Action Taken#4: Contract Status: 5 <br /> Remedial Action Taken#5: Federal Exempt: N <br /> Remedial Action Taken#6: Case List: <br /> Remedial Action Taken#7: 1_UFT Considerations <br /> Agencies <br /> Interim Remediation: N Interim Remediation Date: <br /> LUSTIS Update: Last Technical Correspondence: 1/31/01 <br /> Review Status: Priority: CAQT Category: <br /> Lead Agency: L-Local Agency LOP Site(Pilot Program): EY <br /> Emergency Response?: N State DES Report Filed?: N <br /> Discovery Date: How Discovered: How Stoped: <br /> Leak Started: Leak Stop Date: Primary: NT-New Tank <br /> Leak Source: U-Unknown Leak Cause: U-Unknown Secondary: <br /> Excavation Started: Tertiary: <br /> 771 <br /> 71 <br /> Monitoring Wells: 5 Free Product: Dissolved Constituent: TPHG&D <br /> Maximum Concentrations Current Concentrations <br /> TPH-Soil: Depth to GW: 8.98'ft <br /> TPH-GW: 231 ppb TPH-GW: 320 ppb <br /> Benzene-Soil: <br /> Benzene-GW: 9.7 ppb Benzene-GW: <1,Oppb <br /> MTBE-Soil: 2.3 ppm <br /> MTBE-GW: 29000 ppb MTBE-GW: 1740 ppb <br /> Maximum MTBE Date: 11/19/1997 <br /> ;== Fidancial <br /> Program Element Code: 3526-LOP GW SITE <br /> Responsible Parties- <br />
The URL can be used to link to this page
Your browser does not support the video tag.