My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:49:15 PM
Creation date
2/6/2019 3:46:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAM B R I A <br /> For the quarterly sampling event occurring this month we will implement the sampling and <br /> analytical changes requested by SJCEHD. We will plan to do the annual event during the third <br /> quarter 2005. We would appreciate SJCEHD review the recommended changes to the sampling <br /> and analytical program we have discussed above. <br /> WORK PLAN <br /> Technical Rationale for Proposed Scope of Work <br /> © • SJCEHD is requiring an additional monitoring well be installed northwest of well <br /> MW-5. <br /> • Groundwater flow direction beneath this site is consistently to the north. <br /> • Cambria proposes to drill and install one groundwater monitoring wells northwest of <br /> well MW-5, as shown on Figure 2. <br /> Work Tasks <br /> Permits: Cambria will obtain a drilling permit from SJCEHD and inform the adjacent property <br /> owner, for which we already have an access agreement in place,that we will be installing another <br /> well on the property. <br /> Site Safety Plan: Cambria will prepare a Site Safety Plan for fieldwork. <br /> Utility Clearance: Cambria will mark the proposed drilling location and will clear the location <br /> through Underground Service Alert prior to drilling. <br /> Site Investigation: One groundwater monitoring well (MW-13) is proposed at the location <br /> shown on Figure 2. The well boring will be drilled to approximately 10 feet below first <br /> encountered groundwater using hollow-stem auger drilling equipment and will be converted to a <br /> groundwater monitoring well. <br /> A Cambria geologist will supervise the drilling and will describe encountered soils from the well <br /> boring using the Unified Soil Classification System and Munsell Soil Color Charts. Soil samples <br /> from the well boring will be collected at 5-foot intervals for soil description, possible chemical <br /> 1015 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.