Laserfiche WebLink
f <br /> BMs. Lori Duncan S E C 0 R <br /> May 27, 2005 <br /> Page 5 <br /> Sincerely, <br /> SECOR International, Incorporated <br /> / AL GE�� <br /> Brian Carey city 01 wt %- <br /> Associate Geologist r <br /> 16 <br /> Diane Barclay, C.H.G. OF C���` <br /> Senior Geologist <br /> Attachments: Table 1 — Soil Borings and Well Completions <br /> Figure 1 — Site Location Map <br /> Figure 2 — Site Plan with Proposed Boring Locations <br /> Figure 3 — Detailed Site Plan of Chevron Facility <br /> Figure 4 — Detailed Site Plan of ARCO Facility <br /> Attachment 1 —SJCEHD letter dated March 7, 2005 <br /> Attachment 2 — Field and Laboratory Procedures <br /> cc: Darin Rouse, ChevronTexaco Environmental Management Company, <br /> San Ramon, California <br /> Paul Supple, Atlantic Richfield Company, Moraga, California <br /> Marcus Pierce, California Regional Water Quality Control Board—Central Valley <br /> Region, Sacramento, California <br /> Eric Holm, Delta Environmental Consultants, Inc., Rancho Cordova, California <br />