My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2905 Benjamin Holt <br /> December 1997 <br /> Page Z . <br /> The groundwater assessment included in the addendum indicated that concentrations of MTBE <br /> observed in MW9 may be originating from the ARCO facility immediately south of the site; <br /> while the increasing concentrations observed in MW4,adjacent to the operating Chevron . <br /> tanks,has not been determined. PHS/EHD will require additional monitoring wells cross and <br /> ' down gradient to MW4,so that the extent of the plume'can be estimated. PHS/EHD also <br /> suggests investigation of source of contamination evidenced in MW4, The most recent results <br /> (September 1997) documented MTBE contamination of 2,100 ppb when in February 1997, 16 <br /> ppb MTBE contamination was observed. The sharp increase in MTBE contamination <br /> evidenced first in May 1997 followed the start-up of operations of the new tank configuration. <br /> i <br /> i <br /> The addendum reviewed the feasibility and cost effectiveness of the soil vapor extraction/air j <br /> sparging remediation system which has been installed. The addendum indicated that the soil <br /> vapor extraction system would be operating for approximately one year. It is PHS/EHD's <br /> understanding the system has not been operating due to high groundwater levels. The most <br /> recent quarterly report which PHS/EHD received indicated that the groundwater levels have <br /> decreased,please keep PHS/EHD updated on the status of the vapor extraction system's <br /> operation'. <br /> The addendum also included cleanup goals which reasonably comply with the Central Valley <br /> Regional Water Quality Control Board's Basin Plan. <br /> y <br /> Please submit a work plan by January 15, 1998 which proposes at least two monitoring wells <br /> to investigate the contamination observed in MW4. Quarterly remediation progress reports!, <br /> should be included with the monitoring results. <br /> If you have any questions,please contact me at (209) 468-0337. <br /> Donna Heran, REHS,Director <br /> Environmental Health Division <br /> Mary Meays,Senior REHS Mar�etLagorio,REHS <br /> Site Mitigation Unit Supervisor <br /> c: Pat Anderson,CVRWQCB <br /> c: David Irey,SJC,DA Environmental Prosecution Unit <br /> c: Annabel Mackey,SWRCB-Cleanup Fund <br /> c: Ed Formosa,City of Stockton MUD <br /> c: Paul Supple,ARCO <br /> c: Aaron O'Brien,Geraghty and Miller <br />
The URL can be used to link to this page
Your browser does not support the video tag.