Laserfiche WebLink
i <br /> Y <br /> Chevron <br /> Chevron U.S.A. Inc. <br /> 2410 Camino Ramon, San Ramon; California- Phone NO)842-9500 <br /> Mail Address:P.O.Box 5004,San Ramon,CA 94583-0804 <br /> � h <br /> Marketing Department �l "? <br /> February 18,.1992 ���fR 1 <br /> P <br /> Ms. Margaret Lagorio <br /> San Joaquin County Environmental Health <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Re: `Chevron Station#9-4275, <br /> 2905 West Benjamin Holt Drive,Stockton, CA <br /> Dear Ms. Lagorio: <br /> Enclosed is.a work plan addendum #2 dated',February 10, 1992, which was prepared by <br /> Chevron's consultant, Groundwater Technology-.Inc.-(GTI), to describe the proposed installation <br /> of two groundwater monitoring wells andOne--vadose well.at the site captioned above. This <br /> addendum #2 serves as a revision to GTI's'January 27., 1992 work plan addendum #1 and to <br /> GTI's June 1990 work plan. <br /> i <br /> If you have any questions or comments, I can be`-reached at(510) 842-8658. j <br /> Sincerely, <br /> i <br /> Clint B. Rogers <br /> Site Assessment and Remediation Engineer , <br /> i <br /> { <br /> Enclosure <br /> cc: Elizabeth Thayer,Central Valley RWQCB, Sacramento, CA <br /> Jim Grasty, GTI; Sacramento, CA (w/o enclosure ) <br />