Laserfiche WebLink
_ s <br /> Clint Rogers <br /> i <br /> Page 2 <br /> Water samples from the existing monitoring wells should be collected only after stabilization is achieved. <br /> All water samples are to be placed in an ice chest maintained at 40C. These samples are to be taken to a <br /> lab certified by Department of Health Services (DHS) for the methods listed in the work plan. <br /> After the permit for installation of the BAT Probes has been approved, provide this office with a 48 hour <br /> notice prior to their installation. <br /> If you have any questions, contact Margaret Lagorio, Senior REHS, at (209)468-3449. <br /> Jogi Khanna, M.D., M.P.H. <br /> Health O 'ter <br /> urie A. otC`ulla, REHS, Program Manager <br /> t <br /> %Environmental Health Division <br /> LAC/ML:nr <br /> c: Earth Technology Corp. <br /> 100 W. Broadway, Ste. 5000 <br /> Long Beach, CA 90802 <br /> j <br /> 1 <br /> 1 <br /> i <br /> I <br />{ <br />