My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 27 '85 16.21 CHEVRON MARKETING/tAN RAMON,CA. P,2_ <br /> Chevron <br /> • Chevron U.S.A. .,,, � <br /> 2410 Camino Ramon,Sen Ramon, California•Pitone 14151842.9500• <br /> Mail Addicts:P0.aax 5004,$en Ramon,CA 84589.0004 ' <br /> Marketing Operations <br /> Q.Moller <br /> Oivi��en Meneger,Opotation� • <br /> S.L Patterson <br /> Area Manepar,Operations <br /> C.'G,Trimbech <br /> Maraper,EnpinaarinQ <br /> Mr: Gordon.:.Boggs <br /> :California Regional Water <br /> Quality Control Board <br /> Centreil 'Valley 'Region <br /> 3443 Routier Road , <br /> Sacramento,' CA 95537 <br /> J January 27, 1989 <br /> Re: SS 49-4275 <br /> '2905 H. Benjamin Holt <br /> .Stockton, CA . . <br /> Dear 'Mr. .Bog <br /> go: <br /> Chevron has retained Western Geologic Resources (WGR) to conduct an <br /> investigation at the above referenced Site. The • investigation and remed- <br /> iation, if necessary, will be •conducted in a .phased approach: <br /> Phase I Soil' Vapor Survey <br /> Phase II Monitoring Well installation <br /> Phase III Remediation <br /> The timing for each phase is dependent upon regulatory approval, however <br /> Chevron is prepared to begin each phase according to the following time- <br /> frame: <br /> Phase I Within. 7 days upon work plan approval <br /> from San Joaquin stealth District <br /> Phase II Within 14 days of Health District <br /> approval. <br /> Phase III Within 30 days of Health Distric <br /> approval <br /> IL you have any questions or. require additional information, please call <br /> Lisa Marinaro at (415) 842-9527. <br /> Very truly yours, <br /> D. Moller <br /> Yt . <br /> sa Mar nar�rE�nglne�er <br /> cc: . Me. Kazey Foley <br /> San Joaquin Local Health District'. f <br /> P.O. Box 2009 <br /> Stockton, California 95201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.