Laserfiche WebLink
Stephanie McKenna <br /> CP0034 APR 8 2010 <br /> COST PRE-APPROVAL BREAKDOWN <br /> Classification UNITS Rate Cost <br /> TASK 1:Semi-Annual Monitoring <br /> and Sampling-25 Wells-1 Q,8 <br /> Wells-3Q <br /> Stantec Labor <br /> Principal 2 hrs $154.00 $308.00 <br /> Project Manager 1 6 hrs $118.00 $708.00 <br /> Design Engineer 4 hrs $94.00 $376.00 <br /> Staff En /Sci/Geo II 8 hrs $87.00 $696.00 <br /> Assistant En /Sci/Geo 38 hrs $74.00 $2,812.00 <br /> Administrative 11 12 hrs $62.00 $744.00 <br /> Stantec Equipment <br /> Photoionization Detection PID 4 days $110.00 $440.00 <br /> Water Level Meter 4 days $25.00 $100.00 <br /> Drums-55 Gallon <br /> 10 each $55.00 $550.00 <br /> Field Vehicle 4 days $175.00 $700.00 <br /> Bailers-Disposable 33 each $10.00 $330.00 <br /> Level D Safety Equipment <br /> 4 days $50.00 $200.00 <br /> Water Sampling meters(DO, pH, 4 each $100.00 $400.00 <br /> SC <br /> REBILLABLES <br /> Lab Analysis-TPHg,BTEX, 41 each $70.00 $2,870.00 <br /> Oxygenates <br /> County Permitting 2 Estimate $504.00 $1,008.00 <br /> Misc.Materials 1 each $150.00 $150.00 <br /> Waste Disposal(assumes non 1 Estimate $3.00 $3,000.00 <br /> hazardous <br /> Markup Costs 10% $7,731.00 <br /> TASK 2: Four Quarterly <br /> Monitoring or Status Reports <br /> 4Q09-3Q10 <br /> Stantec Labor <br /> Principal 6 hrs $154.00 $924.00 <br /> Project Manager 1 12 hrs $118.00 $1,416.00 <br /> Design Engineer 8 hrs $94.00 $752.00 <br /> Staff En /Sci/Geo 11 56 hrs $87.00 $4,872.00 <br /> CADD Technician II 24 hrs $80.00 $1,920.00 <br /> Administrative 11 8 hrs $62.00 $496.00 <br /> TASK 3:Stantec Labor Project <br /> Management <br /> Principal 18 hrs $154.00 $2,772.00 <br /> Project Manager 1 36 hrs $118.00 $4,248.00 <br /> Administrative II 48 hrs $62.00 $2,976.00 <br /> TOTAL $36,471 <br /> COSTS <br /> Calaforniaf'nvirow w,-NlalProleclion fIgency <br /> .n <br /> �a RecycledPape� <br />