My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CP0034 -2- March 28, 2007 <br /> Task descriptions are the same as those identified in Secor's February 1, 2007, <br /> cost pre-approval request. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The <br /> Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. <br /> • The work products must be acceptable to-the County. <br /> • If a different scope of work becomes necessary, then you must request pre-approval <br /> of costs on.the.new.scope of.work. <br /> • Although I have referred to the Secor proposal in my pre-approval above, please be <br /> .aware that you will be entering into a private contract: the State of California cannot <br /> compel you to sign any specific contract. - <br /> Please remember that it is still necessary to submit the actual costs of the work as <br /> explained in the Reimbursement Request Instructions to confirm that the costs are <br /> consistent with this pre-approval before you will be reimbursed. Please insure that <br /> your consultant prepares their invoices to include the required breakdown of <br /> costs on a time and materials basis, that,invoiced tasks are consistent with the <br /> original proposal, and that reasonable explanations are provided for any changes <br /> made in the scope of work or increases in the costs. When the.invoices are <br /> submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • _ technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions at (916) 341-5796. <br /> Sincerely, <br /> Mark Owens, P.E. <br /> Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Lori Duncan, SJCEHD, Stockton <br /> Kristi Shelton, Secor, Rancho Cordova <br /> CalzforniaEnvironmevlalProlecliov flgency <br /> ;,a RecycledPq <br />
The URL can be used to link to this page
Your browser does not support the video tag.