Laserfiche WebLink
BUDGET FOR 2006 O&M,AND QUARTERLY SAMPLING AND REPORTING Date: 06-Feb-06 <br /> Commingle Plume#0034 <br /> ARCO 2133/Chevron 9-4275 Project Manager: Brian Carey <br /> 2908 Benjamin HoIV2905 Benjamin Holt SECOR Rate Set: 2005A <br /> Stockton, California <br /> Phase, ' ' 4 Unit/D_esc, ,: ', Rate•,. 'Marklu N.Extensiori ` ,.Subtotal <br /> z r u� ,,Y <br /> P: a. <br /> 0001 v Remedial S stem 08M' <br /> �/ <br /> 7 .-..,•...�.,._ ,.�.r....-(, <br /> 68:75,''• <br /> (Includes scheduling,coordination,subcontractor costs, and field labor for monthly operation and maintenance of one air sparge system currently <br /> existing at ARCO 2133,2908 Benjamin Holt Drive) <br /> 'O&M-Coordination & Scheduling $540.00 <br /> Project Manager . 2 hours $100.00 $200.00 <br /> Staff Engineer 4 hours $85.00 $340.00 <br /> O&M - Field Work $840.00 <br /> Technician 12 hours $70.00 $840.00 <br /> Other Direct Charges $388.75 <br /> SECOR Field Truck 1 day $75.00 $75.00 <br /> Water Level Indicator 1 day $25.00 $25.00 <br /> Misc. Materials 3 each $25.00 5% $78.75 <br /> Electricity for remedial system (PG&E) 1 each $200.00 5% $210.00 <br /> - _;.;i � --+,c .,,,n.,,%-.� I"'�"�- ��-:' ��Y��'�.:{,a t4'kya�7i.S.:�uT yi i, "f rT^r t ..�`�a7 M?, i„" I(F�"C," rev`-,•aE'1., t .. us..'ft<, - <br /> . _�:,,,, ,,,.....,, ,�.,:.,,. ..•_ ra.w.u,ta,.,. .r,L,t.h�.d»„��'1».�..,.v5t,.._,r� ,4, I � ., .,: .. <br /> (Prepare and submit quarterly remedial summary reports documenting O&M and operational status of the air sparge unit, <br /> reports will include graphs of concentration vs time,and conclusions and recommendations.) <br /> O&M- Reporting $1,030.00 <br /> Senior Engineer 2 hours $115.00 $230.00 <br /> Staff Engineer 10 hours $80.00 $800.00 <br /> f 1 f� E A +� Y. <br /> 0003;' Quarterly Monitoringnd Sa�mplm9 (quarterly�mY ';$8;907.50 <br /> (Includes groundwater monitoring coordination,sampling and reporting for the 29 existing wells on a quarterly basis) <br /> (Assume 29 wells will be monitored each quarter for depth to water and Separate Phase petroleum hydrocarbons) <br /> (Assume a total of 13 wells will be sampled in the 2nd and 4th Quarters,29 wells will be sampled in the 1st Quarter, <br /> and 22 wells will be sampled in the 3rd quarter) <br /> 1 st Q 2006 29 monitor 29 sample <br /> 2nd Q 2006 29 monitor 13 sample <br /> 3rd Q 2006 .29 monitor 22 sample <br /> 4th Q 2006 29 monitor 13 sample <br /> Quarterly Totals: 116 77 <br /> Quarterly Average Numbers: 29 19.25 <br /> Labor-Well Sampling $2,610.00 <br /> Project Manager 2 hours $100.00 $200.00 <br /> Staff Geologist 2 hours $85.00 $170.00 <br /> Technician 32 hours $70.00 $2,240.00 <br /> Other Direct Charges <br /> SECOR Field Truck 3 day $75.00 $225.00 $1,267.50 <br /> Water Level Indicator 3 day $25.00 $75.00 <br /> generator 1 week $45.00 $150.00 <br /> submersible pump` 3 each $45.00 $135.00 <br /> Traffic Control 1.00 event $650.00 5% $682.50 <br /> Labor-Monitoring Report $2,500.00 <br /> Project Manager 4. hours $100.00 $400.00 <br /> Staff Geologist 20 hours $80.00 $1,600.00 <br /> Drafting _ 6 hours $65.00 $390.00 <br /> Administration 2 hours $55.00 $110.00 <br /> Laboratory Fees -Water Samples $1,320.00 <br /> TPH-G/BTEX/Oxygenates via 8260 -Monit 20 sample,, $60.00 $1,320.00 <br /> via 8260-Monitoring wells <br /> Waste Disposal and Coordination $1,210.00 <br /> Staff Geologist 2 hours $80.00 $160.00 <br /> Integrated Waste Management 10 drums $100.00 5% $1,050.00 <br /> File:Projects\ConocoPhillips\6004\budgets\9-4275 M&S budget 2006.xls Page 1 of 2 <br />